A partially submerged vessel has been reported at the approaches to False Creek at 49 17.034N 123 09.019W.
The bow of the vessel is showing 1 to 2 feet above water.
Caution.
The seasonal decommissioning of Canadian Coast Guard navigational buoys and placing of winter spars in the commercial sector is underway in : St. Lawrence Gulf - Port au Port - north Northeast Gulf - north.
Mariners are requested to contact the appropriate MCTS centre to inquire about the buoy tending operations status and/or to consult the Canadian Coast Guard website at the following address: navigation-electronique.canada.ca.
The seasonal decommissioning of Canadian Coast Guard navigational buoys is underway in small craft channels.
Mariners are requested to contact the appropriate MCTS centre to inquire about the buoy tending operations status and/or to consult the Canadian Coast Guard website at the following address: navigation-electronique.canada.ca
Permanently relocated to 46 01.210N 062 28.960W
Dredging operations taking place daily from 1200 UTC until 0000 UTC beginning 08 Nov 2024 at Wheatley Harbour. Work will be focused on the west side of the East pier.
Minimum wake requested.
Unlit
Inoperative
Underwater cathodic protection systems and cables installed in the vicinity of Powell wharf, Port-Alfred.
Construction operations taking place daily from 1300 UTC until 0100 UTC beginning 07 Nov 2024 in the Hecla Harbour. Excavator and other heavy equipment on site. Mariners are requested to use caution when approaching or using the launch ramp.
Unreliable
Lavaltrie ice boom installed for the season.
Lanoraie ice boom installed for the season.
Subsurface taut-line current meter moorings are deployed at positions 47 32.369N 054 08.960W and 47 25.457N 054 09.679W, The uppermost flotation is 30 meters subsurface. The moorings will stay in place for 90-days and then will be recovered. There are no floats or other surface expression.
caution.
As a result of hydrographic survey the following shallower depths were found at:
Latitude Longitude Depth (m)
46 10.140N 060 17.243W 7.63
46 10.331N 060 17.258W 9.54
Construction operations including divers will be working in the vicinity of 53 59.723N 128 41.149W in Kitimat Harbour.
Hours of Operation Daily 1400UTC to 0200UTC Nov 05 to Dec 01.
Work Vessels on site Haisla Northwind, BMT Magellan, BMT skiff and Saam Star.
Mariners to contact the Haisla Northwind prior to approaching when Diver Down flag is displayed.
Unlit.
Permanently relocated to 45 41 36.7N 073 27 37.6W, and changed from Île Deslauriers range light LL 2331.1, focal height 32.5 metres, nominal range 4 NM, to Île Ste-Thérèse range light LL 2330.1, focal height 18.23 metres, nominal range 7.3 NM.
Yellow buoy temporarily established at 47 52.319N 069 34.206W missing.
Post dredging survey reports depths in the navigable channel of the Mission River have been dredged to a minimum depth of 8.25 metres.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.