Subsea ROV inspection of BC Hydro transmission cables between English Bluff Terminal and Galiano Island.
Hours of operation 1500-0000 UTC Apr 22nd.
Vessel on site monitoing VHF CH. 16 and 71
On site vessel will have limitied maneuverability requesting a minimum wake and to stay 1 cable from vessel.
Fibre optic cable maintenance between Port Neville at 50 29.517N 126 05.217W and Sayward at 50 23.900N 125 57.633W.
Hours of operation from 1400-0200 UTC Apr 22nd to Apr 25th.
Vessel on site monitoring VHF CH. 16,11 and 13.
Mariners to stay 100 meters from cable lay vessel.
Off position in 46 16.730N 063 50.860W
Submarine fibre optic cable maintenance off Van Anda, Texada Island from 49 45.533N 124 33.200W to 49 45.617N 124 33.000W
Hours of operation from 1400-0200UTC Apr 21st to 24th.
Vessel on site monitoring VHF CH. 16 and 11.
Installation of submarine date cable from Port Washington to Ganges is now complete.
Off station at 45 59.0N 081 55.6W
Off position, 50 metres to the southeast.
Two Uncrewed Surface Vessels (USV) will operate from Coast Marina, Victoria Harbour to circumnavigate Race Rocks and then return to Coast Marina.
Hours of operation 1500 to 0000 UTC from Apr 22nd to Apr 24th.
Call operators at 1-833-667-6268 for any questions or concerns.
Unreliable
Damaged, top missing.
Unlit
Floating dock installation taking place during day light hours from 22 to 25 Apr 2025. Barge on site.
Dredging operations taking place daily between 1100 UTC and 2300 UTC from 22 Apr 2025 until 15 Jul 2025 at the Millerand fishing port at 47 12.96N 061 59.09W. Dredge and barges on site.
Immersion site: 47 11.80N 061 58.60W
Minimum wake requested.
Bridge construction is ongoing on the Patullo Bridge at 49 12.500N 122 53.533W.
Hours of operation from 1300 to 1000 UTC daily.
Mariners are asked to avoid areas marked with flashing amber lights and to contact work vessels on channel 74
sixty minutes prior to transiting for restrictions and current channel closures.
Vessels on site monitoring VHF channels 16, 64A, 69, 71 and 74.
Minimum wake.
An uncharted and unlit white steel mooring buoy is anchored on the edge of the channel in Woodward Reach at 49 07.023N 123 04.821W.
Construction and diving operations taking place daily from 21 Apr to 30 Oct 2025. Tugs and barges on site.
Ship loader located at ICO dock 2 awash.
Caution.
Anchoring in the Bagotville wharf and surrounding areas is prohibited with the exception of cruise ships.
Off station 30 metres to the south.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.