Construction operations taking place Monday to Friday from 1100 UTC until 2300 UTC at Kelso Park and along the Lalonde Park promenade in Sainte-Anne-de-Bellevue. Barges on site and lit at night.
Sounding surveys have identified shallower depths in the following locations:
47 17.880N
47 18.120N
47 18.270N
47 19.100N
47 17.290N
47 17.850N
053 58.540W
053 58.120W
053 57.560W
053 57.980W
053 59.550W
053 59.560W
32.6
25.3
36.7
10.9
9.1
13.5
The 5 meter contour has become unreliable between the following locations as it has shoaled inward towards the deep part of the channel:
1 - 47 18.520N 053 58.250W
2 - 47 18.660N 053 58.120W
Caution.
Private yellow buoys placed to mark shallow areas.
Permanently relocated to 46 33.452N 064 05.791W
Installation operations underway at the aquaculture site in Northwest Cove, Hermitage Bay in the vicinity of 47 39.017N 055 46.033W.
Caution
Shallower depths reported at the entrance to Wheatly Harbour.
Exercises using white parachute flares taking place daily until 010400 UTC Nov 2024 at the Land Force Central Area Training Centre in Meaford.
Green Buoy partially submerged in the vicinity of Burnt Islands Tickle.
Unlit
Permanently relocated from 46 24.720N 63 00.496W to 46 24.602N 063 00.495W
Marine retrofit operations on the existing berth 2 structure at Westshore Terminals.
Hours of operation 24 hours a day commencing 1200 UTC Sep 30 until 0300 UTC November 1
Cautionary Light (Fl Y4s (Priv)) at the northeast corner of the LNG Canada dock in the vicinity of 54 00.067N 128 41.050W, Unlit
Shallower depth reported at 42 28.238N 082 25.609W in the Marine Park marina channel, 30 centimetres.
Subsurface mooring deployed in 45 27.765N 061 02.831W, consisting of an acoustic receiver housed in a modified lobster trap that sits on bottom and is attached to a buoyant spool containing 100m of line. Spool floats approximately 3m above bottom, mooring is deployed at 51m depth.
Subsurface mooring deployed in 45 29.129N 061 10.040W, consisting of an acoustic receiver housed in a modified lobster trap that sits on bottom and is attached to a buoyant spool containing 100m of line. Spool floats approximately 3m above bottom, mooring is deployed at 39m depth.
Subsurface mooring deployed in 45 21.700N 061 08.640W, consisting of an acoustic receiver housed in a modified lobster trap that sits on bottom and is attached to a buoyant spool containing 100m of line. Spool floats approximately 3m above bottom, mooring is deployed at 55m depth.
Subsurface mooring deployed in 45 21.380N 060 55.250W, consisting of an acoustic receiver housed in a modified lobster trap that sits on bottom and is attached to a buoyant spool containing 150m of line. Spool floats approximately 3m above bottom, mooring is deployed at 91m depth.
Privately maintained speed limit light buoy at 45 15.325N 074 08.943W unlit.
An obstruction has been identified at:
Latitude Longitude Depth (in Metres)
45 54.988N 059 58.274W 6.2
A subsurface mooring deployed in 45 02.284N 061 51.894W at a depth of 5.85 metres.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.