Ice Control Zone Tango (T) has been fully activated and declared in force.
Mariners are cautioned that bergy waters exist South and East of this zone.
All laden oil tankers and ships carrying chemicals in bulk should comply with Transport Canada's TP 15163 of the Joint-Industry Government Guidelines.
Lifted for winter
Dredging Operations underway in Glace Bay Harbour. Operations will be 7:30AM-4:30PM Monday to Sunday by barge mounted excavator, scow barges with work boat and safety boat. Mariners are requested to provide a low wake and wide berth.
Shallower depth located at 50 16.448N 064 46.884W, 0.7 metres.
A subsurface scientific instrument was deployed on the seafloor of Cascadia Basin in the vicinity of 48 11.053N 127 11.510W.
The device extends 2m off the seafloor.
Diving operations taking place at the Tadoussac ferry dock Monday to Thursday from 1100 UTC to 2215 UTC.
Dredging Operations underway in the Saint John Harbour and Courtenay Bay, Saint John, New Brunswick. Operations will be conducted 24 hours a day by a barge-mounted mechanical dredge and bottom dumping scows with the tug Wavemaster. Mariners are requested to provide a low wake and wide berth.
Off position
Missing
Shallower depths are reported along the Halifax Seaport from Pier 20 to Pier 22 due to ongoing scour repairs and rock placement extending up to 8 metres outward from the seawall.
Unreliable
Ice booms between Prescott and Cardinal installed for the season.
Ice Control Zone V1 Zone activated.
Riprap work taking place at pier 25 beginning 15 Jan 2026.
Shoals located at:
69 56.012N 123 51.025W, depth unknown69 54.007N 123 59.020W, depth unknown69 48.591N 124 07.422W, depth unknown
Aground
Unlit
Temporarily changed from a nominal range of 10nm, 24 hours a day to a nominal range of 4nm, lit only at night.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.