Lost fishing vessel anchor with rope and orange buoy in 46 05.940N 063 27.700W.
Caution
Yellow wave measuring buoy 1 meter in diameter and equipped with an amber flashing light established in 44 59.352N 061 45.931W. The buoy has a smaller buoy attached to mark the anchor line.
Vertical clearance under the Laviolette bridge reduced to:
- Vertical clearance available 30 metres on either side of the bridge center (green light): 48.80 metres- Vertical clearance available 60 metres on either side of the bridge center (green light): 48.60 metres
Privately maintained orange and white mooring buoy marking the shipwreck "Ash Island barge" replaced with plastic jug.
Two orange and white mooring buoys marking the shipwreck "Kinghorn" replaced with plastic jug.
Changed from flash 0.5 seconds, eclipse 3.5 seconds to flash 1 second, eclipse 4 seconds.
Changed from flashing 0.5 seconds, eclipse 3.5 seconds to flashing 1 second, eclipse 4 seconds. Nominal range changed from 2 to read 4.
Missing
A large orange scotchman buoy has been deployed in Tolmie Channel at 52 41.313N 128 33.531W.
The buoy is attached to the end of a new fibre optic cable installation.
Caution.
Enterprise Reef lateral buoy U51 has been permanently changed to Enterprise Reef East Cardinal Light Buoy UL.
Flash characteristics: White VQ(3)5s
Position remains unchanged at 48 50.5754’ N, 123 20.3457’W
New LLNO 271.20
Changed from flash 0.5 seconds, eclipse 3.5 seconds to flash 1.0 seconds, eclipse 3.0 seconds.
Changed from 2 group flashes every 8 seconds to flash 1.0 seconds eclipse 4.0 seconds.
Changed from flash 0.5 seconds, eclipse 3.5 seconds to flash 1.0 seconds, eclipse 4.0 seconds.
Changed from flash 0.5 seconds, eclipse 3.5 seconds to flash 1.0 seconds, eclipse 3.0 seconds. Nominal range changed from 2.0 NM to 4.0 NM.
Nominal range 4 NM
Nominal range 2 NM.
Exercises using white parachute flares taking place daily until 010500 UTC Dec 2024 at the Land Force Central Area Training Centre in Meaford.
Installation of public safety booms upstream from the Coteau dams in progress. Barges and tugs on site.
Dredging operations taking place Monday to Friday from 1200 UTC until 0000 UTC beginning Nov 14 2024 at Colchester Harbour. Barge and excavator on site.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.