Exclude NAVWARNs of regional scope
Reset

Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
Grid
Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
Areas affected by the message
RELOCATED - Shipping Safety Control Zone 12 2019-08-03
NW-A-0086-19

Relocated approximately 60 metres South East of current position. Approximate position 69 37.40’N 135 29.19’W. Racon continues to show characteristic morse "Y" as advertised.

Areas affected by the message
Marine works - Southwest Coast 2019-08-02
NW-N-1015-19

 A wave measurement buoy has been deployed in position 46 52.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

A current sensor has also been deployed at this position at a depth of 24 meters.

Caution.

 

 

 

 

 

 

 

Areas affected by the message
Marine works - Southwest Coast 2019-08-02
NW-N-1014-19

 A wave measurement buoy has been deployed in position 46 51.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

Caution.

 

 

 

 

 

 

 

Areas affected by the message
Marine works - Southwest Coast 2019-08-02
NW-N-1013-19

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 50.0 N 055 42.0 W.

Caution.

 

 

 

 

 

 

 

Areas affected by the message
Marine works - Southwest Coast 2019-08-02
NW-N-1012-19

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 48.0 N 055 43.0 W.

Caution.

 

 

 

 

 

 

 

Areas affected by the message
Aids to Navigation - Lake Nipissing 2019-07-31
NW-C-1837-19

Permanently discontinued

Areas affected by the message
Aids to Navigation - Lake Nipissing 2019-07-31
NW-C-1836-19

Permanently discontinued

Areas affected by the message
Aids to Navigation - North Channel - Brush Island 2019-07-20
NW-C-1672-19

Red spar buoy UY2/2 temporarily established in 46 04.294N 081 48.299W.

Areas affected by the message
Obstruction - floating and falling debris - Montréal to Trois-Rivières - Lake St-Pierre Archipelago 2019-07-19
NW-Q-1266-19

Floating and falling debris reported beneath the bridge located at 46 04.783N 073 09.205W. The bridge is marked with yellow buoys suspended at mid-height between the deck and the water level. Warning signs installed above. 

Areas affected by the message
Marine works - Halifax Harbour and Approaches - Halifax Harbour 2019-07-18
NW-M-1375-19

Construction of extension to Halifax Harbour pier 42, extending 138 meters south. New southern corners will be at:

44° 37.471'N 063° 33.489'W
44° 37.466'N 063° 33.499'W

Areas affected by the message
Obstruction - Concreat slab - Trois-Rivières to Donnacona - Duplessi Bridge 2019-07-15
NW-Q-1222-19

Concrete slab reported submerged in 46 21.508N 072 32.269W. Slab is 3 metres by 3 metres, with a metal bar awash and a tree attached to it.

Areas affected by the message
Waterway information - Montréal to Trois-Rivières - Section 102E 2019-07-15
NW-Q-1217-19

Shallower depth located at:

45 37.405N 073 29.946W, 10.5 metres

Areas affected by the message
Aids to Navigation - Eastern Shore 2019-07-12
NW-M-1345-19

Unreliable

Areas affected by the message
Waterway information - North Channel - St. Joseph Island 2019-07-12
NW-C-1596-19

Clearance under the southern span of the Twyning Island bridge reported reduced due to high water levels. 

Areas affected by the message
Subsurface Mooring Buoy - Explorer 2019-07-12
NW-P-0958-19

An acoustic subsurface mooring buoy has been deployed at 48 59.631N 130 54.074W. The mooring extends 20 meters from the sea floor. 

Areas affected by the message
Waterway information - Port of Montreal - Wharf 14E 2019-07-11
NW-Q-1184-19

Shallower depth located at:

45 30 11.34N 073 32 52.17W, 8.2 metres

Areas affected by the message
Marine works - Halifax Harbour and Approaches 2019-07-09
NW-M-1312-19

A caisson is permanently installed at the southern end of Halterm southeast container terminal. 

North corner: 44 37 31.86N 063 33 32.74W

East corner: 44 37 30.98N 063 33 31.91W

South corner: 44 37 30.67N 063 33 32.55W

West corner: 44 37 31.54N 063 33 33.39W

 

Areas affected by the message
Obstruction - Lake Nipissing - Three Sisters Islands 2019-07-05
NW-C-1518-19

Remains of destroyed Three Sisters Day Beacon K2 tower awash 30 to 40 centimetres above water. 

Areas affected by the message
Aids to Navigation - Lake Nipissing - Three Sisters Islands 2019-07-05
NW-C-1517-19

Destroyed

Areas affected by the message
Underwater cable - Fundy - Cape Sharp, N.S. 2019-07-02
NW-M-1232-19

Unlighted yellow and white buoy, attached to a 1200 foot cable, anchored in 45 20.822N 064 27.743W. The buoy and cable will swing with tide change. Caution.

Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
Details
Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
ID Date Title Areas Charts Description
NW-A-0086-19
Areas affected by the message
69° 37.400'N 135° 29.190'W
2019-08-03 RELOCATED Shipping Safety Control Zone 12 7662(NAD83)

Relocated approximately 60 metres South East of current position. Approximate position 69 37.40’N 135 29.19’W. Racon continues to show characteristic morse "Y" as advertised.

Aids: Pelly Island Racon
NW-N-1015-19
Areas affected by the message
46° 52.000'N 055° 40.000'W
2019-08-02 Marine works Southwest Coast 4625(NAD83)

 A wave measurement buoy has been deployed in position 46 52.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

A current sensor has also been deployed at this position at a depth of 24 meters.

Caution.

 

 

 

 

 

 

 

NW-N-1014-19
Areas affected by the message
46° 51.000'N 055° 40.000'W
2019-08-02 Marine works Southwest Coast 4625(NAD83)

 A wave measurement buoy has been deployed in position 46 51.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

Caution.

 

 

 

 

 

 

 

NW-N-1013-19
Areas affected by the message
46° 50.000'N 055° 42.000'W
2019-08-02 Marine works Southwest Coast 4625(NAD83)

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 50.0 N 055 42.0 W.

Caution.

 

 

 

 

 

 

 

NW-N-1012-19
Areas affected by the message
46° 48.000'N 055° 43.000'W
2019-08-02 Marine works Southwest Coast 4625(NAD83)

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 48.0 N 055 43.0 W.

Caution.

 

 

 

 

 

 

 

NW-C-1837-19
Areas affected by the message
46° 07.095'N 079° 31.713'W
2019-07-31 Aids to Navigation Lake Nipissing 6035(NAD83)

Permanently discontinued

Aids: Wades Creek ( Wades Landing ) range rear light LL 1430
NW-C-1836-19
Areas affected by the message
46° 07.150'N 079° 31.783'W
2019-07-31 Aids to Navigation Lake Nipissing 6035(NAD83)

Permanently discontinued

Aids: Wades Creek (Wades Landing) range front light LL 1429
NW-C-1672-19
Areas affected by the message
46° 04.294'N 081° 48.299'W
2019-07-20 Aids to Navigation North Channel - Brush Island 2207(NAD83)

Red spar buoy UY2/2 temporarily established in 46 04.294N 081 48.299W.

NW-Q-1266-19
Areas affected by the message
46° 04.783'N 073° 09.205'W
2019-07-19 Obstruction - floating and falling debris Montréal to Trois-Rivières - Lake St-Pierre Archipelago 1312(NAD83)

Floating and falling debris reported beneath the bridge located at 46 04.783N 073 09.205W. The bridge is marked with yellow buoys suspended at mid-height between the deck and the water level. Warning signs installed above. 

NW-M-1375-19
Areas affected by the message
44° 37.498'N 063° 33.523'W
Pt 1: 44° 37.471'N 063° 33.489'W
Pt 2: 44° 37.466'N 063° 33.499'W
Pt 3: 44° 37.526'N 063° 33.557'W
Pt 4: 44° 37.532'N 063° 33.547'W
2019-07-18 Marine works Halifax Harbour and Approaches - Halifax Harbour 4202(NAD83), 4203(NAD83)

Construction of extension to Halifax Harbour pier 42, extending 138 meters south. New southern corners will be at:

44° 37.471'N 063° 33.489'W
44° 37.466'N 063° 33.499'W

NW-Q-1222-19
Areas affected by the message
46° 21.508'N 072° 32.269'W
2019-07-15 Obstruction - Concreat slab Trois-Rivières to Donnacona - Duplessi Bridge 1313(NAD83)

Concrete slab reported submerged in 46 21.508N 072 32.269W. Slab is 3 metres by 3 metres, with a metal bar awash and a tree attached to it.

NW-Q-1217-19
Areas affected by the message
45° 37.405'N 073° 29.946'W
2019-07-15 Waterway information Montréal to Trois-Rivières - Section 102E 1310(NAD83)

Shallower depth located at:

45 37.405N 073 29.946W, 10.5 metres

NW-M-1345-19
Areas affected by the message
44° 39.451'N 062° 50.281'W
2019-07-12 Aids to Navigation Eastern Shore 4236(NAD83)

Unreliable

Aids: Psyche Rock East Cardinal light and bell buoy YS LL 580.3
NW-C-1596-19
Areas affected by the message
46° 18.724'N 083° 59.297'W
2019-07-12 Waterway information North Channel - St. Joseph Island 2250(WGS84)

Clearance under the southern span of the Twyning Island bridge reported reduced due to high water levels. 

NW-P-0958-19
Areas affected by the message
48° 59.631'N 130° 54.074'W
2019-07-12 Subsurface Mooring Buoy Explorer 3000(NAD27)

An acoustic subsurface mooring buoy has been deployed at 48 59.631N 130 54.074W. The mooring extends 20 meters from the sea floor. 

NW-Q-1184-19
Areas affected by the message
45° 30.189'N 073° 32.870'W
2019-07-11 Waterway information Port of Montreal - Wharf 14E 1310(NAD83)

Shallower depth located at:

45 30 11.34N 073 32 52.17W, 8.2 metres

NW-M-1312-19
Areas affected by the message
44° 37.506'N 063° 33.528'W
Pt 1: 44° 37.517'N 063° 33.533'W
Pt 2: 44° 37.500'N 063° 33.517'W
Pt 3: 44° 37.500'N 063° 33.533'W
2019-07-09 Marine works Halifax Harbour and Approaches 4202(NAD83), 4203(NAD83)

A caisson is permanently installed at the southern end of Halterm southeast container terminal. 

North corner: 44 37 31.86N 063 33 32.74W

East corner: 44 37 30.98N 063 33 31.91W

South corner: 44 37 30.67N 063 33 32.55W

West corner: 44 37 31.54N 063 33 33.39W

 

NW-C-1518-19
Areas affected by the message
46° 14.846'N 079° 26.357'W
2019-07-05 Obstruction Lake Nipissing - Three Sisters Islands 6035(NAD83)

Remains of destroyed Three Sisters Day Beacon K2 tower awash 30 to 40 centimetres above water. 

NW-C-1517-19
Areas affected by the message
46° 14.846'N 079° 26.357'W
2019-07-05 Aids to Navigation Lake Nipissing - Three Sisters Islands 6035(NAD83)

Destroyed

Aids: Three Sisters Day Beacon K2
NW-M-1232-19
Areas affected by the message
45° 20.822'N 064° 27.743'W
Pt 1: 45° 21.022'N 064° 27.743'W
Pt 2: 45° 21.007'N 064° 27.634'W
Pt 3: 45° 20.963'N 064° 27.542'W
Pt 4: 45° 20.898'N 064° 27.480'W
Pt 5: 45° 20.822'N 064° 27.459'W
Pt 6: 45° 20.746'N 064° 27.480'W
Pt 7: 45° 20.681'N 064° 27.542'W
Pt 8: 45° 20.637'N 064° 27.634'W
Pt 9: 45° 20.622'N 064° 27.743'W
Pt 10: 45° 20.637'N 064° 27.852'W
Pt 11: 45° 20.681'N 064° 27.944'W
Pt 12: 45° 20.746'N 064° 28.006'W
Pt 13: 45° 20.822'N 064° 28.027'W
Pt 14: 45° 20.898'N 064° 28.006'W
Pt 15: 45° 20.963'N 064° 27.944'W
Pt 16: 45° 21.007'N 064° 27.852'W
2019-07-02 Underwater cable Fundy - Cape Sharp, N.S. 4010(NAD83)

Unlighted yellow and white buoy, attached to a 1200 foot cable, anchored in 45 20.822N 064 27.743W. The buoy and cable will swing with tide change. Caution.

Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
Table
Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
ID Date Title Areas Charts Description
NW-A-0086-19 2019-08-03 RELOCATED Shipping Safety Control Zone 12 7662(NAD83)

Relocated approximately 60 metres South East of current position. Approximate position 69 37.40’N 135 29.19’W. Racon continues to show characteristic morse "Y" as advertised.

Aids: Pelly Island Racon
NW-N-1015-19 2019-08-02 Marine works Southwest Coast 4625(NAD83)

 A wave measurement buoy has been deployed in position 46 52.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

A current sensor has also been deployed at this position at a depth of 24 meters.

Caution.

 

 

 

 

 

 

 

NW-N-1014-19 2019-08-02 Marine works Southwest Coast 4625(NAD83)

 A wave measurement buoy has been deployed in position 46 51.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

Caution.

 

 

 

 

 

 

 

NW-N-1013-19 2019-08-02 Marine works Southwest Coast 4625(NAD83)

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 50.0 N 055 42.0 W.

Caution.

 

 

 

 

 

 

 

NW-N-1012-19 2019-08-02 Marine works Southwest Coast 4625(NAD83)

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 48.0 N 055 43.0 W.

Caution.

 

 

 

 

 

 

 

NW-C-1837-19 2019-07-31 Aids to Navigation Lake Nipissing 6035(NAD83)

Permanently discontinued

Aids: Wades Creek ( Wades Landing ) range rear light LL 1430
NW-C-1836-19 2019-07-31 Aids to Navigation Lake Nipissing 6035(NAD83)

Permanently discontinued

Aids: Wades Creek (Wades Landing) range front light LL 1429
NW-C-1672-19 2019-07-20 Aids to Navigation North Channel - Brush Island 2207(NAD83)

Red spar buoy UY2/2 temporarily established in 46 04.294N 081 48.299W.

NW-Q-1266-19 2019-07-19 Obstruction - floating and falling debris Montréal to Trois-Rivières - Lake St-Pierre Archipelago 1312(NAD83)

Floating and falling debris reported beneath the bridge located at 46 04.783N 073 09.205W. The bridge is marked with yellow buoys suspended at mid-height between the deck and the water level. Warning signs installed above. 

NW-M-1375-19 2019-07-18 Marine works Halifax Harbour and Approaches - Halifax Harbour 4202(NAD83), 4203(NAD83)

Construction of extension to Halifax Harbour pier 42, extending 138 meters south. New southern corners will be at:

44° 37.471'N 063° 33.489'W
44° 37.466'N 063° 33.499'W

NW-Q-1222-19 2019-07-15 Obstruction - Concreat slab Trois-Rivières to Donnacona - Duplessi Bridge 1313(NAD83)

Concrete slab reported submerged in 46 21.508N 072 32.269W. Slab is 3 metres by 3 metres, with a metal bar awash and a tree attached to it.

NW-Q-1217-19 2019-07-15 Waterway information Montréal to Trois-Rivières - Section 102E 1310(NAD83)

Shallower depth located at:

45 37.405N 073 29.946W, 10.5 metres

NW-M-1345-19 2019-07-12 Aids to Navigation Eastern Shore 4236(NAD83)

Unreliable

Aids: Psyche Rock East Cardinal light and bell buoy YS LL 580.3
NW-C-1596-19 2019-07-12 Waterway information North Channel - St. Joseph Island 2250(WGS84)

Clearance under the southern span of the Twyning Island bridge reported reduced due to high water levels. 

NW-P-0958-19 2019-07-12 Subsurface Mooring Buoy Explorer 3000(NAD27)

An acoustic subsurface mooring buoy has been deployed at 48 59.631N 130 54.074W. The mooring extends 20 meters from the sea floor. 

NW-Q-1184-19 2019-07-11 Waterway information Port of Montreal - Wharf 14E 1310(NAD83)

Shallower depth located at:

45 30 11.34N 073 32 52.17W, 8.2 metres

NW-M-1312-19 2019-07-09 Marine works Halifax Harbour and Approaches 4202(NAD83), 4203(NAD83)

A caisson is permanently installed at the southern end of Halterm southeast container terminal. 

North corner: 44 37 31.86N 063 33 32.74W

East corner: 44 37 30.98N 063 33 31.91W

South corner: 44 37 30.67N 063 33 32.55W

West corner: 44 37 31.54N 063 33 33.39W

 

NW-C-1518-19 2019-07-05 Obstruction Lake Nipissing - Three Sisters Islands 6035(NAD83)

Remains of destroyed Three Sisters Day Beacon K2 tower awash 30 to 40 centimetres above water. 

NW-C-1517-19 2019-07-05 Aids to Navigation Lake Nipissing - Three Sisters Islands 6035(NAD83)

Destroyed

Aids: Three Sisters Day Beacon K2
NW-M-1232-19 2019-07-02 Underwater cable Fundy - Cape Sharp, N.S. 4010(NAD83)

Unlighted yellow and white buoy, attached to a 1200 foot cable, anchored in 45 20.822N 064 27.743W. The buoy and cable will swing with tide change. Caution.

Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
Compact
Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
ID Date Charts Title
NW-A-0086-19 2019-08-03 7662(NAD83) RELOCATED

Relocated approximately 60 metres South East of current position. Approximate position 69 37.40’N 135 29.19’W. Racon continues to show characteristic morse "Y" as advertised.

Aids: Pelly Island Racon
NW-N-1015-19 2019-08-02 4625(NAD83) Marine works

 A wave measurement buoy has been deployed in position 46 52.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

A current sensor has also been deployed at this position at a depth of 24 meters.

Caution.

 

 

 

 

 

 

 

NW-N-1014-19 2019-08-02 4625(NAD83) Marine works

 A wave measurement buoy has been deployed in position 46 51.0 N 055 40.0 W marked with 0.25 meter yellow Spar with radar reflector.

Caution.

 

 

 

 

 

 

 

NW-N-1013-19 2019-08-02 4625(NAD83) Marine works

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 50.0 N 055 42.0 W.

Caution.

 

 

 

 

 

 

 

NW-N-1012-19 2019-08-02 4625(NAD83) Marine works

A 0.25 meter yellow Spar with radar reflector has been deployed in position 46 48.0 N 055 43.0 W.

Caution.

 

 

 

 

 

 

 

NW-C-1837-19 2019-07-31 6035(NAD83) Aids to Navigation

Permanently discontinued

Aids: Wades Creek ( Wades Landing ) range rear light LL 1430
NW-C-1836-19 2019-07-31 6035(NAD83) Aids to Navigation

Permanently discontinued

Aids: Wades Creek (Wades Landing) range front light LL 1429
NW-C-1672-19 2019-07-20 2207(NAD83) Aids to Navigation

Red spar buoy UY2/2 temporarily established in 46 04.294N 081 48.299W.

NW-Q-1266-19 2019-07-19 1312(NAD83) Obstruction - floating and falling debris

Floating and falling debris reported beneath the bridge located at 46 04.783N 073 09.205W. The bridge is marked with yellow buoys suspended at mid-height between the deck and the water level. Warning signs installed above. 

NW-M-1375-19 2019-07-18 4202(NAD83), 4203(NAD83) Marine works

Construction of extension to Halifax Harbour pier 42, extending 138 meters south. New southern corners will be at:

44° 37.471'N 063° 33.489'W
44° 37.466'N 063° 33.499'W

NW-Q-1222-19 2019-07-15 1313(NAD83) Obstruction - Concreat slab

Concrete slab reported submerged in 46 21.508N 072 32.269W. Slab is 3 metres by 3 metres, with a metal bar awash and a tree attached to it.

NW-Q-1217-19 2019-07-15 1310(NAD83) Waterway information

Shallower depth located at:

45 37.405N 073 29.946W, 10.5 metres

NW-M-1345-19 2019-07-12 4236(NAD83) Aids to Navigation

Unreliable

Aids: Psyche Rock East Cardinal light and bell buoy YS LL 580.3
NW-C-1596-19 2019-07-12 2250(WGS84) Waterway information

Clearance under the southern span of the Twyning Island bridge reported reduced due to high water levels. 

NW-P-0958-19 2019-07-12 3000(NAD27) Subsurface Mooring Buoy

An acoustic subsurface mooring buoy has been deployed at 48 59.631N 130 54.074W. The mooring extends 20 meters from the sea floor. 

NW-Q-1184-19 2019-07-11 1310(NAD83) Waterway information

Shallower depth located at:

45 30 11.34N 073 32 52.17W, 8.2 metres

NW-M-1312-19 2019-07-09 4202(NAD83), 4203(NAD83) Marine works

A caisson is permanently installed at the southern end of Halterm southeast container terminal. 

North corner: 44 37 31.86N 063 33 32.74W

East corner: 44 37 30.98N 063 33 31.91W

South corner: 44 37 30.67N 063 33 32.55W

West corner: 44 37 31.54N 063 33 33.39W

 

NW-C-1518-19 2019-07-05 6035(NAD83) Obstruction

Remains of destroyed Three Sisters Day Beacon K2 tower awash 30 to 40 centimetres above water. 

NW-C-1517-19 2019-07-05 6035(NAD83) Aids to Navigation

Destroyed

Aids: Three Sisters Day Beacon K2
NW-M-1232-19 2019-07-02 4010(NAD83) Underwater cable

Unlighted yellow and white buoy, attached to a 1200 foot cable, anchored in 45 20.822N 064 27.743W. The buoy and cable will swing with tide change. Caution.

Showing results 1,401 to 1,420, from 1,665 total results.
Showing results 1,401 to 1,420, from 1,665 total results.
Date Modified: