Missing
Drilling operations underway at the Bedford Institute of Oceanography in Bedford Basin , Nova Scotia. Operations will take place during daylight hours. Work boat and barge on site.
Mariners are requested to use caution and provide a minimum wash and wide berth when transiting the area.
Shallow depth confirmed in Shippagan, New Brunswick at 092000 UTC Jun 2026.
Latitude Longitude Depth (meters)
47 42.638N 064 40.026W 2m
47 42.603N 064 40.210W 1.93m
47 42.572N 064 40.281W 1.53m
47 42.663N 064 39.724W 1.95m
Off position
Permanently Removed
Daylight hour geographic survey work in 47 54.851N 065 51.217W from July 14 until August 14, 2026. The work is being conducted from a self propelled green spud barge.
Minimum wash and wide berth requested.
Light characteristics changed from Fl 0.5s Ec 3.5s to Fl 2s Ec 4s.
Light name changed to Pictou Island West Breakwater and light characteristics changed from Fl 1s Ec 3s to Fl 2s Ec 2s.
Light characteristics changed to Fl 1s Ec 4s.
Light Permanently Discontinued
Pipeline installation taking place Monday to Friday during daylight hours. Clay and mud pile will remain on scene and above the waterline until completion of work. Barge on site during work hours only.
Dredging operations underway with a Barge and Scow in Grand Anse Harbour, New Brunswick in position 47 49.143N 065 10.584W . The material is to be disposed in the containment cell at Grande Anse harbour.
The amphibious, conventional and suction dredge Amphibex will be conducting dredging operations, 24 hours a day, 7 days a week, at Caissie Cape, NB from 15 July to Oct 30, 2026. Caution.
Load site:
46 18.755N 064 30.585W
Disposal site:
46 18.652N 064 30.671W
White and blue sailing vessel 7 meters in length reported aground at 44 56.120N 079 59.230W.
Light established on the Pendticton Pier at 49 30.291N 119 35.797W. Light is at a height of 0.6m, displaying Fl Y
0.5s Ec 3.5s and has a nominal range of 3nm.
Subsurface mooring reported in 64 19.049N 096 02.095W at 140025 UTC Jul 2026. Top of mooring 0.5m from the seabed, depth of water 3.25m.
These moorings will remain deployed until October 2026.
East Marine Exclusion Zone buoys EKO9, EKO10, EKO11 and EKO12 replaced with temporary lit markers.
Caution.
Permanently relocated to mile 592.3 to 65 29.993N 127 39.235W.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.