Exclude NAVWARNs of regional scope
Reset

Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
Caution. In enabling the option to Exclude NAVWARNs of regional scope in your search parameters, some relevant NAVWARNs associated to the Regional or National areas may be missing from the search results.
Grid
Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
Areas affected by the message
MCTS - Shipping Safety Control Zone 6 2021-07-31
NW-A-0057-21

Iqaluit MCTS. All services located at Resolute off air 311200 UTC Jul 2021.

Areas affected by the message
Aids to Navigation - Shipping Safety Control Zone 12 2021-07-31
NW-A-0056-21

Removed for maintenance until further notice.

Areas affected by the message
Aids to Navigation - Shipping Safety Control Zone 16 2021-07-30
NW-A-0052-21

Racon X and S bands Out of service.

Areas affected by the message
Obstruction - Northwest Labrador Sea, Shipping Safety Control Zone 15 2021-07-26
NW-A-0050-21

Scientific sub-surface instrument deployed in position 60 29.068 N 061 15.709 W at a depth of 510m, top of the instrument 509 m below the surface.

Caution

Areas affected by the message
Obstruction - Northwest Labrador Sea, Shipping Safety Control Zone 15 2021-07-26
NW-A-0049-21

Scientific sub-surface mooring deployed in position  60 28.414 N, 61 15.992 W at a depth of 497m, top of the instrument 407 m below the surface.

Caution

Areas affected by the message
MCTS HF Services - Shipping Safety Control Zone 15 2021-07-19
NW-A-0046-21

Iqaluit MCTS. GMDSS receive and transmit services on HFDSC, 16804.5khz, located at Iqaluit off air 192030 UTC Jul 2021.

Areas affected by the message
MCTS HF Services - Shipping Safety Control Zone 6 2021-07-12
NW-A-0037-21

Iqaluit MCTS. HF Broadcast service on 4363 kHz located at Resolute off air 121300 UTC Jul 2021.

Areas affected by the message
Aids to Navigation - Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 2021-07-09
NW-H-0051-21

Green Buoy established mile 954.6 at 68 05.733 N 134 27.983 W.

Areas affected by the message
Marine works - Shipping Safety Control Zone 15 2021-07-08
NW-A-0024-21

Marine infrastructure construction works in Koojesse Inlet (Frobisher Bay) until NOV 2021. Area is bounded by:

63 43.442N 068 31.374W

63 43.458N 068 30.980W

63 43.257N 068 30.813W

63 43.182N 068 31.109W

Areas affected by the message
Marine works - Shipping Safety Control Zone 15 2021-07-08
NW-A-0023-21

Marine infrastructure construction works in Peterhead Inlet (Frobisher Bay) until NOV 2021. Area is
bounded by:

63 43.206N 068 31.401W

63 43.175N 068 31.400W

63 43.180N 068 31.376W

63 43.207N 068 31.379W

Areas affected by the message
Marine works - Shipping Safety Control Zone 13 2021-07-08
NW-A-0022-21

Marine infrastructure construction works in Pond Inlet until 160000 UTC, NOV 2021. Area is marked by 4 points and bounded by:

72 42.018N 077 58.903W

72 41.930N 077 58.390W

72 41.631N 077 59.109W

72 41.722N 077 59.508W

 

Areas affected by the message
Obstruction - Churchill 2021-07-08
NW-A-0021-21

Scientific mooring placed on the bed of the Churchill River estuary, at 58 45.798 N 094 12.332 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.4 m.

Areas affected by the message
Obstruction - Churchill 2021-07-08
NW-A-0020-21

Scientific mooring placed on the bed of the Churchill River estuary, at 58 47.108 N 094 12.982 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 15 m.

Areas affected by the message
Obstruction - Churchill 2021-07-06
NW-A-0019-21

Scientific mooring placed on the bed of the Churchill River estuary, at 58 46.342 N 094 12.030 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.3m.

Areas affected by the message
Aids to Navigation - Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 2021-06-28
NW-H-0017-21

Re-established and Permanently moved to 68°12’ 14” N 134°28’ 12” W

Areas affected by the message
Aids to Navigation - Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 2021-06-28
NW-H-0016-21

Re-established and Permanently moved to 68°12’ 21” N 134°28’ 12” W

Areas affected by the message
MCTS VHF Services - Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 - Parson's Lake 2021-06-13
NW-H-0006-21

Iqaluit MCTS. All VHF RT services located at Parson’s Lake off air 132100 UTC Jun 2021.

Areas affected by the message
Ice control zone activated - Arctic, Labrador, Newfoundland, Shipping Safety Control Zone 15 2021-02-13
NW-N-0178-21

Ice Control Zone T Zone activated north of 55 degrees latitude.

Areas affected by the message
Waterway information - Shipping Safety Control Zone 7 2020-11-23
NW-A-0199-20

During a recent hydrographic survey aboard the CCGS Sir Wilfrid Laurier CHS found these depths which are shallower than charted at the following locations.  

Latitude (N)      Longitude  (W)       Depth (metres)

68 25.763N       096 37.351W         13.2

68 25.524N       096 35.652W         13.7

Areas affected by the message
Aids to Navigation - Shipping Safety Control Zone 15 2020-11-02
NW-A-0192-20

2 buoys have been established as part of the Iqaluit marine infrastructure construction work in Koojesse Inlet in positions:

Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
Details
Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
ID Date Title Areas Charts Description
NW-A-0057-21
Areas affected by the message
74° 44.783'N 095° 00.183'W
2021-07-31 MCTS Shipping Safety Control Zone 6 7511(WGS84)

Iqaluit MCTS. All services located at Resolute off air 311200 UTC Jul 2021.

NW-A-0056-21
Areas affected by the message
69° 45.000'N 132° 21.500'W
2021-07-31 Aids to Navigation Shipping Safety Control Zone 12 7663(NAD83)

Removed for maintenance until further notice.

Aids: Warren Point Racon
NW-A-0052-21
Areas affected by the message
61° 57.991'N 092° 28.685'W
2021-07-30 Aids to Navigation Shipping Safety Control Zone 16 5642(NAD83)

Racon X and S bands Out of service.

Aids: Walrus Island light LL 2602
NW-A-0050-21
Areas affected by the message
60° 29.068'N 061° 15.709'W
2021-07-26 Obstruction Northwest Labrador Sea, Shipping Safety Control Zone 15 8046

Scientific sub-surface instrument deployed in position 60 29.068 N 061 15.709 W at a depth of 510m, top of the instrument 509 m below the surface.

Caution

NW-A-0049-21
Areas affected by the message
60° 28.414'N 061° 15.992'W
2021-07-26 Obstruction Northwest Labrador Sea, Shipping Safety Control Zone 15 8046

Scientific sub-surface mooring deployed in position  60 28.414 N, 61 15.992 W at a depth of 497m, top of the instrument 407 m below the surface.

Caution

NW-A-0046-21
Areas affected by the message
63° 43.867'N 068° 32.533'W
2021-07-19 MCTS HF Services Shipping Safety Control Zone 15 7127(NAD83)

Iqaluit MCTS. GMDSS receive and transmit services on HFDSC, 16804.5khz, located at Iqaluit off air 192030 UTC Jul 2021.

NW-A-0037-21
Areas affected by the message
74° 44.783'N 095° 00.183'W
2021-07-12 MCTS HF Services Shipping Safety Control Zone 6 7511(WGS84)

Iqaluit MCTS. HF Broadcast service on 4363 kHz located at Resolute off air 121300 UTC Jul 2021.

NW-H-0051-21
Areas affected by the message
68° 05.733'N 134° 27.983'W
2021-07-09 Aids to Navigation Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 6428(NAD83)

Green Buoy established mile 954.6 at 68 05.733 N 134 27.983 W.

NW-A-0024-21
Areas affected by the message
63° 43.336'N 068° 31.079'W
Pt 1: 63° 43.442'N 068° 31.374'W
Pt 2: 63° 43.458'N 068° 30.980'W
Pt 3: 63° 43.257'N 068° 30.813'W
Pt 4: 63° 43.182'N 068° 31.109'W
2021-07-08 Marine works Shipping Safety Control Zone 15 7127(NAD83)

Marine infrastructure construction works in Koojesse Inlet (Frobisher Bay) until NOV 2021. Area is bounded by:

63 43.442N 068 31.374W

63 43.458N 068 30.980W

63 43.257N 068 30.813W

63 43.182N 068 31.109W

NW-A-0023-21
Areas affected by the message
63° 43.192'N 068° 31.389'W
Pt 1: 63° 43.206'N 068° 31.401'W
Pt 2: 63° 43.175'N 068° 31.400'W
Pt 3: 63° 43.180'N 068° 31.376'W
Pt 4: 63° 43.207'N 068° 31.379'W
2021-07-08 Marine works Shipping Safety Control Zone 15 7127(NAD83)

Marine infrastructure construction works in Peterhead Inlet (Frobisher Bay) until NOV 2021. Area is
bounded by:

63 43.206N 068 31.401W

63 43.175N 068 31.400W

63 43.180N 068 31.376W

63 43.207N 068 31.379W

NW-A-0022-21
Areas affected by the message
72° 41.829'N 077° 58.966'W
Pt 1: 72° 42.018'N 077° 58.903'W
Pt 2: 72° 41.930'N 077° 58.390'W
Pt 3: 72° 41.631'N 077° 59.109'W
Pt 4: 72° 41.722'N 077° 59.508'W
2021-07-08 Marine works Shipping Safety Control Zone 13 7212(WGS84)

Marine infrastructure construction works in Pond Inlet until 160000 UTC, NOV 2021. Area is marked by 4 points and bounded by:

72 42.018N 077 58.903W

72 41.930N 077 58.390W

72 41.631N 077 59.109W

72 41.722N 077 59.508W

 

NW-A-0021-21
Areas affected by the message
58° 45.798'N 094° 12.332'W
2021-07-08 Obstruction Churchill 5640(NAD83)

Scientific mooring placed on the bed of the Churchill River estuary, at 58 45.798 N 094 12.332 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.4 m.

NW-A-0020-21
Areas affected by the message
58° 47.108'N 094° 12.982'W
2021-07-08 Obstruction Churchill 5640(NAD83)

Scientific mooring placed on the bed of the Churchill River estuary, at 58 47.108 N 094 12.982 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 15 m.

NW-A-0019-21
Areas affected by the message
58° 46.342'N 094° 12.030'W
2021-07-06 Obstruction Churchill 5640(NAD83)

Scientific mooring placed on the bed of the Churchill River estuary, at 58 46.342 N 094 12.030 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.3m.

NW-H-0017-21
Areas affected by the message
68° 12.600'N 134° 27.700'W
2021-06-28 Aids to Navigation Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 6428(NAD83)

Re-established and Permanently moved to 68°12’ 14” N 134°28’ 12” W

Aids: Mile 963.1 starboard day beacon
NW-H-0016-21
Areas affected by the message
68° 12.517'N 134° 27.883'W
2021-06-28 Aids to Navigation Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 6428(NAD83)

Re-established and Permanently moved to 68°12’ 21” N 134°28’ 12” W

Aids: Mile 963 front range
NW-H-0006-21
Areas affected by the message
68° 53.633'N 133° 56.517'W
2021-06-13 MCTS VHF Services Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 - Parson's Lake 7662(NAD83)

Iqaluit MCTS. All VHF RT services located at Parson’s Lake off air 132100 UTC Jun 2021.

NW-N-0178-21
Areas affected by the message
57° 36.751'N 057° 56.436'W
Pt 1: 60° 00.000'N 064° 17.810'W
Pt 2: 60° 00.000'N 056° 37.912'W
Pt 3: 59° 29.492'N 056° 01.822'W
Pt 4: 58° 57.062'N 055° 33.523'W
Pt 5: 58° 33.691'N 055° 18.811'W
Pt 6: 58° 10.095'N 055° 10.077'W
Pt 7: 57° 53.516'N 054° 59.200'W
Pt 8: 57° 25.393'N 053° 21.642'W
Pt 9: 56° 47.358'N 052° 14.735'W
Pt 10: 56° 14.262'N 051° 39.798'W
Pt 11: 55° 37.243'N 051° 17.222'W
Pt 12: 55° 00.000'N 050° 26.005'W
Pt 13: 55° 59.500'N 061° 30.710'W
Pt 14: 57° 23.160'N 062° 17.399'W
2021-02-13 Ice control zone activated Arctic, Labrador, Newfoundland, Shipping Safety Control Zone 15 5070(NAD83)

Ice Control Zone T Zone activated north of 55 degrees latitude.

NW-A-0199-20
Areas affected by the message
68° 25.763'N 096° 37.351'W
68° 25.524'N 096° 35.652'W
2020-11-23 Waterway information Shipping Safety Control Zone 7 7788(NAD83)

During a recent hydrographic survey aboard the CCGS Sir Wilfrid Laurier CHS found these depths which are shallower than charted at the following locations.  

Latitude (N)      Longitude  (W)       Depth (metres)

68 25.763N       096 37.351W         13.2

68 25.524N       096 35.652W         13.7

NW-A-0192-20
Areas affected by the message
63° 43.333'N 068° 31.017'W
63° 43.267'N 068° 30.983'W
2020-11-02 Aids to Navigation Shipping Safety Control Zone 15 7127(NAD83)

2 buoys have been established as part of the Iqaluit marine infrastructure construction work in Koojesse Inlet in positions:

Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
Table
Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
ID Date Title Areas Charts Description
NW-A-0057-21 2021-07-31 MCTS Shipping Safety Control Zone 6 7511(WGS84)

Iqaluit MCTS. All services located at Resolute off air 311200 UTC Jul 2021.

NW-A-0056-21 2021-07-31 Aids to Navigation Shipping Safety Control Zone 12 7663(NAD83)

Removed for maintenance until further notice.

Aids: Warren Point Racon
NW-A-0052-21 2021-07-30 Aids to Navigation Shipping Safety Control Zone 16 5642(NAD83)

Racon X and S bands Out of service.

Aids: Walrus Island light LL 2602
NW-A-0050-21 2021-07-26 Obstruction Northwest Labrador Sea, Shipping Safety Control Zone 15 8046

Scientific sub-surface instrument deployed in position 60 29.068 N 061 15.709 W at a depth of 510m, top of the instrument 509 m below the surface.

Caution

NW-A-0049-21 2021-07-26 Obstruction Northwest Labrador Sea, Shipping Safety Control Zone 15 8046

Scientific sub-surface mooring deployed in position  60 28.414 N, 61 15.992 W at a depth of 497m, top of the instrument 407 m below the surface.

Caution

NW-A-0046-21 2021-07-19 MCTS HF Services Shipping Safety Control Zone 15 7127(NAD83)

Iqaluit MCTS. GMDSS receive and transmit services on HFDSC, 16804.5khz, located at Iqaluit off air 192030 UTC Jul 2021.

NW-A-0037-21 2021-07-12 MCTS HF Services Shipping Safety Control Zone 6 7511(WGS84)

Iqaluit MCTS. HF Broadcast service on 4363 kHz located at Resolute off air 121300 UTC Jul 2021.

NW-H-0051-21 2021-07-09 Aids to Navigation Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 6428(NAD83)

Green Buoy established mile 954.6 at 68 05.733 N 134 27.983 W.

NW-A-0024-21 2021-07-08 Marine works Shipping Safety Control Zone 15 7127(NAD83)

Marine infrastructure construction works in Koojesse Inlet (Frobisher Bay) until NOV 2021. Area is bounded by:

63 43.442N 068 31.374W

63 43.458N 068 30.980W

63 43.257N 068 30.813W

63 43.182N 068 31.109W

NW-A-0023-21 2021-07-08 Marine works Shipping Safety Control Zone 15 7127(NAD83)

Marine infrastructure construction works in Peterhead Inlet (Frobisher Bay) until NOV 2021. Area is
bounded by:

63 43.206N 068 31.401W

63 43.175N 068 31.400W

63 43.180N 068 31.376W

63 43.207N 068 31.379W

NW-A-0022-21 2021-07-08 Marine works Shipping Safety Control Zone 13 7212(WGS84)

Marine infrastructure construction works in Pond Inlet until 160000 UTC, NOV 2021. Area is marked by 4 points and bounded by:

72 42.018N 077 58.903W

72 41.930N 077 58.390W

72 41.631N 077 59.109W

72 41.722N 077 59.508W

 

NW-A-0021-21 2021-07-08 Obstruction Churchill 5640(NAD83)

Scientific mooring placed on the bed of the Churchill River estuary, at 58 45.798 N 094 12.332 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.4 m.

NW-A-0020-21 2021-07-08 Obstruction Churchill 5640(NAD83)

Scientific mooring placed on the bed of the Churchill River estuary, at 58 47.108 N 094 12.982 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 15 m.

NW-A-0019-21 2021-07-06 Obstruction Churchill 5640(NAD83)

Scientific mooring placed on the bed of the Churchill River estuary, at 58 46.342 N 094 12.030 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.3m.

NW-H-0017-21 2021-06-28 Aids to Navigation Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 6428(NAD83)

Re-established and Permanently moved to 68°12’ 14” N 134°28’ 12” W

Aids: Mile 963.1 starboard day beacon
NW-H-0016-21 2021-06-28 Aids to Navigation Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 6428(NAD83)

Re-established and Permanently moved to 68°12’ 21” N 134°28’ 12” W

Aids: Mile 963 front range
NW-H-0006-21 2021-06-13 MCTS VHF Services Point Separation mile 913 to Kittigazuit Bay mile 1081, Shipping Safety Control Zone 12 - Parson's Lake 7662(NAD83)

Iqaluit MCTS. All VHF RT services located at Parson’s Lake off air 132100 UTC Jun 2021.

NW-N-0178-21 2021-02-13 Ice control zone activated Arctic, Labrador, Newfoundland, Shipping Safety Control Zone 15 5070(NAD83)

Ice Control Zone T Zone activated north of 55 degrees latitude.

NW-A-0199-20 2020-11-23 Waterway information Shipping Safety Control Zone 7 7788(NAD83)

During a recent hydrographic survey aboard the CCGS Sir Wilfrid Laurier CHS found these depths which are shallower than charted at the following locations.  

Latitude (N)      Longitude  (W)       Depth (metres)

68 25.763N       096 37.351W         13.2

68 25.524N       096 35.652W         13.7

NW-A-0192-20 2020-11-02 Aids to Navigation Shipping Safety Control Zone 15 7127(NAD83)

2 buoys have been established as part of the Iqaluit marine infrastructure construction work in Koojesse Inlet in positions:

Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
Compact
Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
ID Date Charts Title
NW-A-0057-21 2021-07-31 7511(WGS84) MCTS

Iqaluit MCTS. All services located at Resolute off air 311200 UTC Jul 2021.

NW-A-0056-21 2021-07-31 7663(NAD83) Aids to Navigation

Removed for maintenance until further notice.

Aids: Warren Point Racon
NW-A-0052-21 2021-07-30 5642(NAD83) Aids to Navigation

Racon X and S bands Out of service.

Aids: Walrus Island light LL 2602
NW-A-0050-21 2021-07-26 8046 Obstruction

Scientific sub-surface instrument deployed in position 60 29.068 N 061 15.709 W at a depth of 510m, top of the instrument 509 m below the surface.

Caution

NW-A-0049-21 2021-07-26 8046 Obstruction

Scientific sub-surface mooring deployed in position  60 28.414 N, 61 15.992 W at a depth of 497m, top of the instrument 407 m below the surface.

Caution

NW-A-0046-21 2021-07-19 7127(NAD83) MCTS HF Services

Iqaluit MCTS. GMDSS receive and transmit services on HFDSC, 16804.5khz, located at Iqaluit off air 192030 UTC Jul 2021.

NW-A-0037-21 2021-07-12 7511(WGS84) MCTS HF Services

Iqaluit MCTS. HF Broadcast service on 4363 kHz located at Resolute off air 121300 UTC Jul 2021.

NW-H-0051-21 2021-07-09 6428(NAD83) Aids to Navigation

Green Buoy established mile 954.6 at 68 05.733 N 134 27.983 W.

NW-A-0024-21 2021-07-08 7127(NAD83) Marine works

Marine infrastructure construction works in Koojesse Inlet (Frobisher Bay) until NOV 2021. Area is bounded by:

63 43.442N 068 31.374W

63 43.458N 068 30.980W

63 43.257N 068 30.813W

63 43.182N 068 31.109W

NW-A-0023-21 2021-07-08 7127(NAD83) Marine works

Marine infrastructure construction works in Peterhead Inlet (Frobisher Bay) until NOV 2021. Area is
bounded by:

63 43.206N 068 31.401W

63 43.175N 068 31.400W

63 43.180N 068 31.376W

63 43.207N 068 31.379W

NW-A-0022-21 2021-07-08 7212(WGS84) Marine works

Marine infrastructure construction works in Pond Inlet until 160000 UTC, NOV 2021. Area is marked by 4 points and bounded by:

72 42.018N 077 58.903W

72 41.930N 077 58.390W

72 41.631N 077 59.109W

72 41.722N 077 59.508W

 

NW-A-0021-21 2021-07-08 5640(NAD83) Obstruction

Scientific mooring placed on the bed of the Churchill River estuary, at 58 45.798 N 094 12.332 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.4 m.

NW-A-0020-21 2021-07-08 5640(NAD83) Obstruction

Scientific mooring placed on the bed of the Churchill River estuary, at 58 47.108 N 094 12.982 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 15 m.

NW-A-0019-21 2021-07-06 5640(NAD83) Obstruction

Scientific mooring placed on the bed of the Churchill River estuary, at 58 46.342 N 094 12.030 W. Mooring secured on the seafloor, unmarked and measures 1.5m. Water depth at high tide 7.3m.

NW-H-0017-21 2021-06-28 6428(NAD83) Aids to Navigation

Re-established and Permanently moved to 68°12’ 14” N 134°28’ 12” W

Aids: Mile 963.1 starboard day beacon
NW-H-0016-21 2021-06-28 6428(NAD83) Aids to Navigation

Re-established and Permanently moved to 68°12’ 21” N 134°28’ 12” W

Aids: Mile 963 front range
NW-H-0006-21 2021-06-13 7662(NAD83) MCTS VHF Services

Iqaluit MCTS. All VHF RT services located at Parson’s Lake off air 132100 UTC Jun 2021.

NW-N-0178-21 2021-02-13 5070(NAD83) Ice control zone activated

Ice Control Zone T Zone activated north of 55 degrees latitude.

NW-A-0199-20 2020-11-23 7788(NAD83) Waterway information

During a recent hydrographic survey aboard the CCGS Sir Wilfrid Laurier CHS found these depths which are shallower than charted at the following locations.  

Latitude (N)      Longitude  (W)       Depth (metres)

68 25.763N       096 37.351W         13.2

68 25.524N       096 35.652W         13.7

NW-A-0192-20 2020-11-02 7127(NAD83) Aids to Navigation

2 buoys have been established as part of the Iqaluit marine infrastructure construction work in Koojesse Inlet in positions:

Showing results 1 to 20, from 91 total results.
Showing results 1 to 20, from 91 total results.
Date Modified: