Submerged
Missing
Awash
Changed to White tower with day boards on all sides, Nominal Range 6 NM Radar reflector added
Temporarily operating at 8NM nominal range.
Lights unlit
Off position
Daily dredging operations underway in Bay St. Lawrence, NS. Operations will be from March 30 until May 08, 2026 during daylight hours. Caution
Daily dredging operations underway in Livingstone Cove, NS. Operations will be from March 30 until April 11, 2026 during daylight hours. Caution
Off position in 43 30.236N 065 48.132W
Lost trawl reported in 42 45.850N 066 21.830W at 281708 UTC Mar 2026. Depth of water: 86m. Length of trawl: 40m.
Maintenance dredging work will be carried out at the Wood Islands wharf site, 24 hours a day, seven days a week, beginning 29 March, 2026. Dredging will be done using floating equipment and an excavator, with disposal at sea via barges and a tugboat. The tugboats Frank C. and Joliane II, dredge S/VM 86, and barges DPO 01 and DPO 02 will be on site. Contact Samuel Arsenault at 418-391-2670.
Off station, 60 metres to the south.
As a result of a sounding survey the following shallower depths have been found.
44 15.648N 064 20.803W - 5.5M
44 15.624N 064 20.663W - 5.5M
44 15.732N 064 21.722W - 5.5M
44 15.913N 064 21.678W - 5.5M
Note: All depths are referenced to CHS benchmark 2011N9000. Elevation +3.722m above chart datum.
Light Unreliable, improper characteristics
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.