NAVWARN details

ID NW-P-1463-24
Date 2024-09-06 22:52 UTC To 2024-09-13 15:47 UTC
Status Cancelled
Title Waterway information
Cancels NW-P-1459-24
Cancelled by NW-P-1495-24
Areas Fraser River
Categories Waterway Information (Other)
Description

Vessels transiting the downstream draw of the Patullo Bridge are required to call 60 minutes before and again 30 minutes before transiting due to bridge construction.

Contact C35406BC on VHF CH 74 to arrange transit

Hours of operation daily 1300 UTC until 0900 UTC daily September 6 until September 17

Caution

Position 49° 12.300'N 122° 53.320'W
Charts 3489(NAD83), 3490(WGS84)

Related links

Date Modified: