Large Boat houses reported to have come free from their moorings, currently trapped with pilings in the North Arm, River Rock casino with potential to drift into Fraser River.
A new fish habitat will be installed in the vicinity of 49 17.333N 122 58.150W.
Hours of operation 1400UTC until 0100UTC Monday to Friday.
On-site vessels monitoring VHF CH69 and 74.
Minimum wake.
Concrete repair of the Coal Harbour Seawall will take place in vicinity of 49 17.673N 123 08.001W and 49 17.610N 123 07.792W
Hours of operation 24 hours a day.
Dredging operations near the Bel Pacific Eburne barge ramp facility in the vicinity of 49 12.040N 123 08.440W.
Hours of Operation: Daily from 1300UTC to 0030UTC Oct. 4 and 5, 2023.
Vessels monitoring VHF Ch 69.
Caution.
A small Uncrewed Surface Vessel (USV) will operate from Tulista Parck in Sidney, BC to Tumbo Island and return.
The USV - DataXplorer 05, is red and white displaying AIS-B, MMSI 316048855.
Hours of operation: 1500 UTC October 4 until 2300 UTC October 05.
Changed from Iso Y 2 sec (Fl 1s; Ec 1s) to Occ Y 5 sec (Fl 4.7s; Ec 0.3 s).
Dock removal and construction will take place in Steveston Harbour at 49 07.168N 123 10.033W.
Hours of operation 1400 to 0030UTC daily.
Vessels on site monitoring VHF channel 69.
Prince Rupert MCTS. VHF RT receive services located at Naden Harbour off air 010300 UTC Oct 2023.
A subsurface mooring has been deployed in position 52 23.620N 131 42.770W, at a depth of 850m.
Off position
Changed from Occ 3s Y (Fl 2s; Ec1s), Bearing 95° 20’ 161m, focal height 19m to Occ (2) 5s (Fl 3.7s; Ec 0.3s; Fl 0.7s; Ec 0.3s); Bearing 95° 15 220m; Focal height 25m.
Damaged and submerged.
Demolition of the Haisla Bridge will take place on the Kitimat River at 54 03.575N 128 40.558W.
Operations active 24 hours a day, 7 days a week.
Crew on site will monitor VHF channel 02.
Repair works taking place on the Pattullo Bridge at 49 12.454N 122 53.436W Monday to Saturday from 1400 UTC to 0030 UTC. Vessels on site monitoring VHF channels 74 and 69.
Mariners are asked to give a 60 minutes advance notice prior to transiting the area.
Unlit
Westham Island Bridge has reopened with a temporary change in channel clearance at the swing bridge to:
West channel = 27 feet
East channel = 29 feet
Shallow water diving for surveying works and remedial works on Berth II Quaywall.
Hours of operation, 11 hours per day, 7 days a week until 1 Dec. 2023.
Daily operations commence at 1400UTC 25 Sep. to 4 Nov. then 1500UTC 5 Nov. to 30 Nov.
Request 50m clearance from dive site.
Vessel Bridgeview II monitoring VHF channels 16 and 11.
Scientific mooring at 53 01.00N 131 26.85W, depth of 17 metres. Mooring extends from the seafloor to the surface and is marked with an orange float.
Pile driving and dredging operations will take place at the Annacis Island Wastewater Treatment Plant at 49 09.540N 122 56.833W.
Hours of Operation 24 hours a day, 7 days a week.
Vessels on site monitoring VHF channels 16, 74 and 06.
Underwater cable has been installed between Scarlett Point and Port Hardy.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.