NAVWARN details
Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
ID | NW-P-1645-24 |
Date | 2024-10-10 19:36 UTC To 2024-11-11 16:00 UTC |
Status | Published |
Title | Marine works - Construction |
Cancels | NW-P-1636-24 |
Areas |
Howe Sound |
Categories |
Wharf Construction |
Description | Construction of the Woodfibre LNG facility is taking place in Squamish Harbour from 49 39.500N 123 15.500W to 49 40.120N 123 14.670W. Operations are active 24 hours a day. Tugs standing by VHF channel 9 and water taxis channel 8. All vessels not affiliated with the project are to avoid the area. |
Position |
49° 39.898'N 123° 15.136'W
Polyline
Pt 1: 49° 39.500'N 123° 15.500'W
Pt 2: 49° 40.120'N 123° 14.670'W |
Charts | 3526(NAD83) |
Related links
- Date Modified: