NAVWARN details
Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
ID | NW-P-1305-24 |
Date | 2024-08-17 19:24 UTC To 2024-10-19 00:00 UTC |
Status | Cancelled |
Title | Marine works - Bridge Construction |
Cancels | NW-P-1273-24 |
Cancelled by | NW-P-1516-24 |
Areas |
Howe Sound |
Categories |
Marine Works (Other) |
Description | Bridge construction is taking place in Squamish Harbour at 49 41.860N 123 09.096W. 6 piers have been installed in the construction of a pedestrian lift span bridge across the Mamquam Blind Channel. The piers are marked with reflectors and yellow flashing lights that display a flash characteristic of (FI) 4s, and have a minimum nautical range of 0.5 nautical mile. Lights are positioned on the side corners of each pier cluster. Work vessels Gibson and Nil I on site monitoring VHF channel 6, 16 and 72. Caution. |
Position |
49° 41.869'N 123° 09.123'W
49° 41.864'N 123° 09.110'W 49° 41.860'N 123° 09.096'W 49° 41.855'N 123° 09.082'W 49° 41.850'N 123° 09.066'W 49° 41.844'N 123° 09.051'W |
Charts | 3534(WGS84) |
Related links
- Date Modified: