NAVWARN details

ID NW-P-0543-25
Date 2025-04-20 14:45 UTC To 2025-04-21 21:20 UTC
Status Cancelled
Title Marine works-Cable lay
Cancels NW-P-0542-25
Cancelled by NW-P-0553-25
Areas Strait of Georgia
Categories Cable Laying Operations
Description

Installation of submarine date cable from Port Washington at 48 48.470N 123 19.140W to Ganges at 48 50.150N 123 28.170W.

Hours of operation 1400-0200 UTC Apr 20th to Apr 23rd.

Vessel on site monitoring VHFCH. 16,11 and 13.

Mariners requested to stay 100 meters from cable lay vessel.

 

Position 48° 48.470'N 123° 19.140'W
48° 50.150'N 123° 28.170'W
Polyline
    Pt 1: 48° 50.150'N 123° 28.170'W
    Pt 2: 48° 49.808'N 123° 26.885'W
    Pt 3: 48° 49.014'N 123° 25.523'W
    Pt 4: 48° 48.322'N 123° 24.783'W
    Pt 5: 48° 47.605'N 123° 22.760'W
    Pt 6: 48° 47.041'N 123° 22.060'W
    Pt 7: 48° 46.630'N 123° 21.554'W
    Pt 8: 48° 46.682'N 123° 20.465'W
    Pt 9: 48° 47.861'N 123° 19.725'W
    Pt 10: 48° 48.470'N 123° 19.140'W
Charts 3442(NAD83), 3478(NAD83)

Related links

Date Modified: