NAVWARN details

ID NW-C-1021-26
Date 2026-04-24 20:27 UTC To 2026-04-24 20:27 UTC
Status Cancelled
Title Marine Works - Bridge Repair
Cancels NW-C-0858-26
Areas Richelieu River and Northern Lake Champlain
Vicinity Turcotte Bridge
Categories Works in Progress
Description

Repair work taking place daily, 24 hours a day at the Turcotte Bridge. Barge and tug on scene. Navigation channel reduced to 25 metres and is marked and lit. Air draft reduced to 12 metres. From 04 May to 08 May 2026 navigation channel reduced to 20 metres.  Any vessels requiring the barge be moved to make passage under the bridge are required to give 72 hours notice by e-mailing m.poirier@pomerleau.ca or alexis.noel@pomerleau.ca, and provide them with:

Date and time of requested passage, vessel name and type, estimated speed of passage, length, beam, and draft of the vessel, and their contact information.

All vessels transiting the area are requested to remain 3 metres away from the barge.

Minimum wake requested.

Monthly Notices to Mariners Eastern Edition 04/2026 refers.

Position
Centroid : 46° 02.481'N 073° 07.075'W
    Pt 1: 46° 02.477'N 073° 07.125'W
    Pt 2: 46° 02.505'N 073° 07.036'W
    Pt 3: 46° 02.488'N 073° 07.021'W
    Pt 4: 46° 02.456'N 073° 07.116'W
Charts 1350(NAD83)

Related links

Date Modified: