NAVWARN details
Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
| ID | NW-C-0725-26 |
| Date | 2026-04-02 13:28 UTC To 2026-04-10 20:18 UTC |
| Status | Cancelled |
| Title | Marine Works - Bridge Repair |
| Cancelled by | NW-C-0806-26 |
| Areas |
Richelieu River and Northern Lake Champlain |
| Vicinity | Turcotte Bridge |
| Categories |
Works in Progress |
| Description | Repair work taking place during daylight hours Monday to Friday at the Turcotte Bridge. Barge and tug on scene. Navigation channel reduced to 25 metres and is marked and lit. Air draft reduced to 12 metres. Any vessels requiring the barge be moved to make passage under the bridge are required give 72 hours notice by e-mailing m.poirier@pomerleau.ca or alexis.noel@pomerleau.ca, and provide them with: Date and time of requested passage, vessel name and type, estimated speed of passage, length, beam, and draft of the vessel, and their contact information. All vessels transiting the area are requested to remain 3 metres away from the barge. Minimum wake requested. |
| Position |
Centroid : 46° 02.481'N 073° 07.075'W
Pt 1: 46° 02.477'N 073° 07.125'W
Pt 2: 46° 02.505'N 073° 07.036'W Pt 3: 46° 02.488'N 073° 07.021'W Pt 4: 46° 02.456'N 073° 07.116'W |
| Charts | 1350(NAD83) |
Related links
- Date Modified: