NAVWARN details

ID NW-P-0494-26
Date 2026-04-08 00:12 UTC To 2026-05-08 02:00 UTC
Status Published
Title Waterway information - Bridge Construction
Areas Howe Sound
Categories Waterway Information (Other)
Description

Bridge construction is ongoing in Squamish in Mamquan Blind Channel at 49 41.858N 123 09.095W.

Hours of operation from 1430 to 0200 UTC from 07 Apr to 08 May, and may result in intermittent obstruction of the navigable channel.

Vessels on site monitoring VHF channels 13.

Position 49° 41.858'N 123° 09.095'W
Charts 3534(WGS84)

Related links

Date Modified: