NAVWARN details

ID NW-C-1361-24
Date 2024-06-14 12:42 UTC To 2025-06-18 05:00 UTC
Status Published
Title Marine works - Bridge repair
Areas St. Clair River
Vicinity Point Edward
Categories Marine Works (Other)
Description

Scaffolding hanging under the Blue Water Bridge reducing vertical clearance by approximately 1.2 metres. Yellow lights temporary installed.

Position 42° 59.912'N 082° 25.427'W
Charts 14865(NAD83)

Related links

Date Modified: