Search for NAVWARNs

Search Criteria

Map of selected areas
Reset

Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
Grid
Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.
Areas affected by the message
Marine Works - Fraser River
2026-06-17 16:45 UTC To 2026-07-11 01:00 UTC
NW-P-0821-26

Dredging operations at the Fraser Surrey docks upper and lower approaches.

Hours of operations daily from 1300-0100 UTC Jun18th to Jul 11th.

Vessels on site monitoring VHF CH. 74

Mariners requested to call 30 mins on approach, floating pipe will be equipped with marker lights during hours of darkness. 

Areas affected by the message
Marine Works - Esquimalt Harbour
2026-06-17 10:29 UTC To 2026-09-18 02:00 UTC
NW-P-0820-26

Environmental fills undewater in Esquimalt Harbour at 48 26.783N 123 26.491W.

Hours of operation Monday to Friday from 1400UTC to 0200UTC 17 Jun to 17 Sep 2026. 

Vessels on site monitoring VHF CH. 10.

 

Areas affected by the message
Aids to Navigation - Strait of Georgia
2026-06-15 22:03 UTC
NW-P-0812-26

Light changed to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.4 Campbell River Ferry Terminal Dolphin No.3

Aids: Campbell River ferry terminal light #2 LL 512.3
Cancels NW-P-1784-25
Areas affected by the message
Aids to Navigation - Strait of Georgia
2026-06-15 22:01 UTC
NW-P-0811-26

Light changed from to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.3 Campbell River Ferry Terminal Dolphin No. 2.

Aids: Campbell River ferry terminal dolphin light #3 LL 512.4
Areas affected by the message
Waterway information - ECHO Program - Haro Strait, Strait of Georgia, Washington State - San Juan Islands
2026-06-15 16:02 UTC To 2026-12-01 07:59 UTC
NW-P-0809-26

HARO STRAIT AND BOUNDARY PASS – ECHO Program 2025 Voluntary Ship Slowdown 

Effective June 15 to November 30, 2026 the ECHO Program voluntary ship slowdown through Haro Strait and Boundary Pass is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales. This initiative will remain in effect 24 hours per day until 2359 PDT on November 30, 2026, depending on southern resident killer whale presence in the fall. If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

This voluntary slowdown takes place between the vessel traffic separation scheme at the south end of Haro Strait at 48-24-22.78 N ,123-12-15.26 W, and the vessel traffic separation scheme at the north end of Boundary Pass at 48-46-39.28 N, 123-1-36.84 W. There are also two optional slow down areas, one rounding Turn Point and the other between Saturna Island and Alden Point, Patos Island. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups.  

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

Areas affected by the message
Scientific Survey - Wave Glider - Explorer, West Coast Vancouver Island South
2026-06-15 15:43 UTC To 2026-08-30 07:00 UTC
NW-P-0807-26

An autonomous Wave Glider will be conducting surveys off the southern half of the west coast of Vancouver Island.

Surveys will run 24 hours a day from 16 June to 29 August. 

The Wave Glider is an autonomous surface vessel, 3m in length and with instruments extending 1m above the waterline. 

The Wave Glider will transit at slow speeds and may change heading frequently. 

Areas affected by the message
Marine Works - Dredging - Fraser River, Strait of Georgia
2026-06-15 06:18 UTC To 2027-03-01 07:00 UTC
NW-P-0806-26

The RIVERFLOW SPIRIT will be conducting maintenance dredging within the main channel of the Fraser River from KM-2 to KM-35.  Disposal activities will be undertaken within the In-River Disposal Site (49 11.753N 122 55.043W), and at the Sand Heads Spoil Site (49 06.727N 123 11.906W).

Hours of Operation:  24 hours.

Monitoring VHF Channel 74.

All vessels are requested to make contact upon approach.

 

Areas affected by the message
Marine Works - Dredging - Fraser River
2026-06-15 00:12 UTC To 2026-09-21 23:00 UTC
NW-P-0805-26

Dredging operations will take place in Sapperton Channel at the Kiewit Marine Yard. 

Operations active 24 hours a day from 15 June to 21 September. 

The dredge anchors will be marked with lights at night.

Vessels on site will be anchored in the navigational channel and monitoring VHF channels 67 and 09.

 

Areas affected by the message
Aids to Navigation - Fraser River
2026-06-10 17:24 UTC
NW-P-0788-26

Permanently discontinued.

Aids: Annieville Channel Pile Wall north light LL 366.3
Cancels NW-P-0675-26
Areas affected by the message
Aids to Navigation - Strait of Georgia
2026-06-09 16:13 UTC
NW-P-0786-26

Nominal range has changed to 4nm with 37 cd

Aids: Repulse Point light buoy P42 LL 498
Areas affected by the message
Aids to Navigation - North Coast
2026-06-08 21:05 UTC
NW-P-0781-26

Light Unreliable

Aids: Ashdown Island light LL 632
Areas affected by the message
Aids to Navigation - Vancouver Harbour
2026-06-04 20:25 UTC
NW-P-0768-26

 The private steel pile mounted navigation aid in the vicinity of 49 17.567N 122 52.050W reported unlit

Areas affected by the message
Aids to Navigation - Haro Strait
2026-06-02 18:41 UTC
NW-P-0760-26

Beacon Damaged

Aids: Tsehum Harbour entrance port bifurcation daybeacon
Areas affected by the message
Aids to Navigation - Fraser River
2026-06-02 16:31 UTC
NW-P-0757-26

Beacon is now submerged and considered a hazard to navigation. 

Aids: Sea Reach port daybeacon #5
Areas affected by the message
Aids to Navigation - Pacific Coast
2026-06-01 15:07 UTC
NW-P-0750-26

A new buoy has been deployed on Quesnel Lake at 52 30.793N 121 14.745W. LL 5583 Wildoat rock buoy.

Areas affected by the message
Juan de Fuca Voluntary Lateral Displacement - Juan de Fuca Strait
2026-05-31 16:12 UTC To 2026-10-31 07:00 UTC
NW-P-0746-26

Effective June 1 to October 31, 2026, the ECHO Program voluntary route alteration is active for all tugs transiting the Canadian inshore area of the Strait of Juan de Fuca to reduce underwater noise for at-risk whales.  

If it is safe and operationally feasible to do so, tugs are requested to navigate either through the outbound shipping lane or the inshore route alteration zone, while maintaining a buffer distance of 1,000 meters from the traffic separation scheme (TSS). The inshore route alteration zone is 1,500 meters wide and occurs between 123-52-21.192 W, 48-18-37.332 N and 124-31-33.378 W, 48-28-53.316 N, covering approximately 28 NM.  

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

Areas affected by the message
Swiftsure Bank Voluntary Slowdown - Juan de Fuca Strait, Pacific South Coast, West Coast Vancouver Island South
2026-05-31 16:09 UTC To 2026-10-31 07:00 UTC
NW-P-0745-26

Effective June 1 to October 31, 2026, the ECHO Program voluntary ship slowdown in the vicinity of Swiftsure Bank is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales.  If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

The voluntary ship slowdown takes place at Swiftsure Bank between 125° 17' W or 48° 19' N on the western or southern sides, and 124° 40’ W on the eastern side. All vessels transiting inbound or outbound are asked to slowdown when it is safe and operationally feasible to do so. Speed transition zones are in place about 2 nautical miles prior to entering the slowdown area. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

Areas affected by the message
Waterway information - Strait of Georgia, West Coast Vancouver Island South
2026-05-31 15:01 UTC To 2027-05-31 00:05 UTC
NW-P-0743-26

Effective 0700 UTC JUN 1 2026, to comply with the Interim Order for the Protection of Southern Resident Killer Whales (Orcinus orca) in the Waters of Southern British Columbia, 2026, vessels must not approach within a distance of 1000m of a Southern Resident Killer Whale in the Southern Resident Killer Whale critical habitat and British Columbia coastal waters east of Vancouver Island and south of Campbell River (Cape Mudge) and Ucluelet, including Barkley Sound (up to Port Alberni) and Howe Sound, with coordinates listed in Schedule 1 of the Interim Order.

These prohibitions are in effect until May 31st, 2027. Details of vessel exceptions from the approach distance are described in Sections 2(1), 2(2), 3(2), and 4(2) of the Interim Order. Note that vessels in transit are excepted from the approach distance measure.

Vessels must not operate or navigate within the two Vessel Restricted Zones, specifically those waters off the eastern coast of Saturna Island and southern coast of North Pender Island, with the coordinates listed in Schedule 2 of the Interim Order.

The Vessel Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Vessel Restricted Zone prohibitions are described in Sections 2(1), 2(2), 5(2) and 6(2) of the Interim Order.

In addition, vessels must adhere to the requirements of two Speed Restricted Zones near Swiftsure Bank, in which all vessels are restricted to a maximum speed of 10 knots over ground, with the coordinates listed in Schedule 3 of the Interim Order.

The Speed Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Speed Restricted Zones are described in Sections 2(1), 2(2), 7(2) and 8(2) of the Interim Order.

Failure to comply with the Interim Order for the Protection of the Southern Resident Killer Whales in the Waters of Southern British Columbia, 2026 could lead to enforcement action, including fines.

Further details are available at Transport Canada’s website (Interim Order for the Protection of the Southern Resident Killer Whale (Orcinus orca) in the Waters of Southern British Columbia, 2026 (canada.ca), or upon request from a Marine Communications and Traffic Services Centre.

Areas affected by the message
Waterway information - Bridge Construction - Fraser River
2026-05-29 01:55 UTC To 2026-09-01 07:00 UTC
NW-P-0735-26

Bridge construction is ongoing on the Patullo Bridge at 49 12.500N 122 53.533W.

Hours of operation from 1300 to 1000 UTC daily.

Mariners are asked to avoid areas marked with flashing amber lights and to contact work vessels on channel 74 

sixty minutes prior to transiting for restrictions and current channel closures.

Vessels on site monitoring VHF channels 16, 64A, 69, 71 and 74.

Minimum wake.

Cancels NW-P-0473-26
Areas affected by the message
Scientific instrument - Strait of Georgia
2026-05-22 20:27 UTC
NW-P-0713-26

A bottom mounted data retrieving instrument has been established in the Strait of Georgia at 49 01.212N 123 11.688W.

The top of the instrument will be 1.0 meters above the seabed and a 60 meter groundline with a weighted line will extend along the seabed. 

will be in place for approximately 1 year. 

Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.
Details
Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.
ID Date Title Areas Charts Description
NW-P-0821-26
Areas affected by the message
49° 11.192'N 122° 54.931'W
49° 10.619'N 122° 55.270'W
2026-06-17 16:45 UTC To 2026-07-11 01:00 UTC Marine Works Fraser River 3489(NAD83), 3490(WGS84), 3491(WGS84)

Dredging operations at the Fraser Surrey docks upper and lower approaches.

Hours of operations daily from 1300-0100 UTC Jun18th to Jul 11th.

Vessels on site monitoring VHF CH. 74

Mariners requested to call 30 mins on approach, floating pipe will be equipped with marker lights during hours of darkness. 

NW-P-0820-26
Areas affected by the message
48° 26.783'N 123° 26.491'W
2026-06-17 10:29 UTC To 2026-09-18 02:00 UTC Marine Works Esquimalt Harbour 3419(WGS84)

Environmental fills undewater in Esquimalt Harbour at 48 26.783N 123 26.491W.

Hours of operation Monday to Friday from 1400UTC to 0200UTC 17 Jun to 17 Sep 2026. 

Vessels on site monitoring VHF CH. 10.

 

NW-P-0812-26
Areas affected by the message
50° 01.831'N 125° 14.269'W
2026-06-15 22:03 UTC Aids to Navigation Strait of Georgia 3540(WGS84)

Light changed to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.4 Campbell River Ferry Terminal Dolphin No.3

Aids: Campbell River ferry terminal light #2 LL 512.3
Cancels NW-P-1784-25
NW-P-0811-26
Areas affected by the message
50° 01.749'N 125° 14.277'W
2026-06-15 22:01 UTC Aids to Navigation Strait of Georgia 3540(WGS84)

Light changed from to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.3 Campbell River Ferry Terminal Dolphin No. 2.

Aids: Campbell River ferry terminal dolphin light #3 LL 512.4
NW-P-0809-26
Areas affected by the message
Polyline
Pt 1: 48° 24.999'N 123° 12.703'W
Pt 2: 48° 24.974'N 123° 09.718'W
Pt 3: 48° 29.295'N 123° 08.342'W
Pt 4: 48° 30.508'N 123° 10.081'W
Pt 5: 48° 35.217'N 123° 12.612'W
Pt 6: 48° 38.323'N 123° 12.365'W
Pt 7: 48° 39.318'N 123° 13.118'W
Pt 8: 48° 39.755'N 123° 11.872'W
Pt 9: 48° 40.629'N 123° 14.183'W
Pt 10: 48° 41.366'N 123° 14.274'W
Pt 11: 48° 45.511'N 123° 01.852'W
Pt 12: 48° 47.786'N 122° 59.126'W
Pt 13: 48° 48.213'N 123° 00.852'W
Pt 14: 48° 46.443'N 123° 03.124'W
Pt 15: 48° 43.799'N 123° 10.769'W
Pt 16: 48° 43.199'N 123° 16.039'W
Pt 17: 48° 39.412'N 123° 16.039'W
Pt 18: 48° 32.851'N 123° 13.440'W
Pt 19: 48° 25.004'N 123° 12.648'W
2026-06-15 16:02 UTC To 2026-12-01 07:59 UTC Waterway information - ECHO Program Haro Strait, Strait of Georgia, Washington State - San Juan Islands 3424(NAD83)

HARO STRAIT AND BOUNDARY PASS – ECHO Program 2025 Voluntary Ship Slowdown 

Effective June 15 to November 30, 2026 the ECHO Program voluntary ship slowdown through Haro Strait and Boundary Pass is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales. This initiative will remain in effect 24 hours per day until 2359 PDT on November 30, 2026, depending on southern resident killer whale presence in the fall. If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

This voluntary slowdown takes place between the vessel traffic separation scheme at the south end of Haro Strait at 48-24-22.78 N ,123-12-15.26 W, and the vessel traffic separation scheme at the north end of Boundary Pass at 48-46-39.28 N, 123-1-36.84 W. There are also two optional slow down areas, one rounding Turn Point and the other between Saturna Island and Alden Point, Patos Island. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups.  

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0807-26
Areas affected by the message
48° 34.877'N 126° 40.142'W
Pt 1: 48° 36.374'N 124° 55.736'W
Pt 2: 47° 43.170'N 127° 01.181'W
Pt 3: 48° 47.256'N 128° 13.026'W
Pt 4: 49° 09.250'N 127° 18.530'W
Pt 5: 49° 14.781'N 126° 17.947'W
2026-06-15 15:43 UTC To 2026-08-30 07:00 UTC Scientific Survey - Wave Glider Explorer, West Coast Vancouver Island South 3653(EPSG:4326)

An autonomous Wave Glider will be conducting surveys off the southern half of the west coast of Vancouver Island.

Surveys will run 24 hours a day from 16 June to 29 August. 

The Wave Glider is an autonomous surface vessel, 3m in length and with instruments extending 1m above the waterline. 

The Wave Glider will transit at slow speeds and may change heading frequently. 

NW-P-0806-26
Areas affected by the message
49° 06.727'N 123° 11.906'W
49° 11.753'N 122° 55.043'W
49° 08.229'N 123° 05.261'W
Pt 1: 49° 06.886'N 123° 16.769'W
Pt 2: 49° 07.686'N 123° 14.890'W
Pt 3: 49° 07.791'N 123° 14.581'W
Pt 4: 49° 07.896'N 123° 14.010'W
Pt 5: 49° 07.901'N 123° 13.567'W
Pt 6: 49° 07.862'N 123° 13.225'W
Pt 7: 49° 07.763'N 123° 12.832'W
Pt 8: 49° 07.266'N 123° 11.575'W
Pt 9: 49° 06.933'N 123° 10.743'W
Pt 10: 49° 06.629'N 123° 09.450'W
Pt 11: 49° 06.543'N 123° 08.852'W
Pt 12: 49° 06.521'N 123° 08.386'W
Pt 13: 49° 06.536'N 123° 07.969'W
Pt 14: 49° 06.579'N 123° 07.565'W
Pt 15: 49° 06.839'N 123° 06.215'W
Pt 16: 49° 07.063'N 123° 05.105'W
Pt 17: 49° 07.133'N 123° 04.926'W
Pt 18: 49° 07.322'N 123° 04.620'W
Pt 19: 49° 08.053'N 123° 03.649'W
Pt 20: 49° 08.605'N 123° 02.914'W
Pt 21: 49° 08.723'N 123° 02.717'W
Pt 22: 49° 08.818'N 123° 02.447'W
Pt 23: 49° 09.107'N 123° 01.146'W
Pt 24: 49° 09.387'N 122° 59.878'W
Pt 25: 49° 09.486'N 122° 59.415'W
Pt 26: 49° 09.506'N 122° 59.249'W
Pt 27: 49° 09.411'N 122° 57.592'W
Pt 28: 49° 09.413'N 122° 57.196'W
Pt 29: 49° 09.462'N 122° 56.986'W
Pt 30: 49° 09.543'N 122° 56.782'W
Pt 31: 49° 09.807'N 122° 56.316'W
Pt 32: 49° 10.102'N 122° 55.842'W
Pt 33: 49° 10.156'N 122° 55.779'W
Pt 34: 49° 10.264'N 122° 55.678'W
Pt 35: 49° 10.462'N 122° 55.569'W
Pt 36: 49° 10.865'N 122° 55.351'W
Pt 37: 49° 11.312'N 122° 55.120'W
Pt 38: 49° 11.675'N 122° 54.919'W
Pt 39: 49° 11.760'N 122° 54.846'W
Pt 40: 49° 11.838'N 122° 54.753'W
Pt 41: 49° 11.952'N 122° 54.577'W
Pt 42: 49° 11.874'N 122° 54.464'W
Pt 43: 49° 11.759'N 122° 54.644'W
Pt 44: 49° 11.657'N 122° 54.750'W
Pt 45: 49° 11.282'N 122° 54.961'W
Pt 46: 49° 10.861'N 122° 55.177'W
Pt 47: 49° 10.461'N 122° 55.392'W
Pt 48: 49° 10.232'N 122° 55.525'W
Pt 49: 49° 10.058'N 122° 55.678'W
Pt 50: 49° 09.731'N 122° 56.200'W
Pt 51: 49° 09.459'N 122° 56.605'W
Pt 52: 49° 09.352'N 122° 56.829'W
Pt 53: 49° 09.299'N 122° 57.036'W
Pt 54: 49° 09.275'N 122° 57.245'W
Pt 55: 49° 09.293'N 122° 57.608'W
Pt 56: 49° 09.394'N 122° 59.295'W
Pt 57: 49° 09.287'N 122° 59.811'W
Pt 58: 49° 09.001'N 123° 01.091'W
Pt 59: 49° 08.701'N 123° 02.440'W
Pt 60: 49° 08.600'N 123° 02.688'W
Pt 61: 49° 08.041'N 123° 03.451'W
Pt 62: 49° 07.275'N 123° 04.454'W
Pt 63: 49° 07.100'N 123° 04.713'W
Pt 64: 49° 06.985'N 123° 04.974'W
Pt 65: 49° 06.939'N 123° 05.134'W
Pt 66: 49° 06.735'N 123° 06.169'W
Pt 67: 49° 06.469'N 123° 07.573'W
Pt 68: 49° 06.429'N 123° 07.961'W
Pt 69: 49° 06.412'N 123° 08.399'W
Pt 70: 49° 06.432'N 123° 08.874'W
Pt 71: 49° 06.520'N 123° 09.500'W
Pt 72: 49° 06.837'N 123° 10.825'W
Pt 73: 49° 07.640'N 123° 12.923'W
Pt 74: 49° 07.719'N 123° 13.239'W
Pt 75: 49° 07.764'N 123° 13.585'W
Pt 76: 49° 07.762'N 123° 14.031'W
Pt 77: 49° 07.644'N 123° 14.592'W
Pt 78: 49° 06.776'N 123° 16.657'W
2026-06-15 06:18 UTC To 2027-03-01 07:00 UTC Marine Works - Dredging Fraser River, Strait of Georgia 3489(NAD83), 3490(WGS84), 3490(WGS84), 3491(WGS84)

The RIVERFLOW SPIRIT will be conducting maintenance dredging within the main channel of the Fraser River from KM-2 to KM-35.  Disposal activities will be undertaken within the In-River Disposal Site (49 11.753N 122 55.043W), and at the Sand Heads Spoil Site (49 06.727N 123 11.906W).

Hours of Operation:  24 hours.

Monitoring VHF Channel 74.

All vessels are requested to make contact upon approach.

 

NW-P-0805-26
Areas affected by the message
49° 13.339'N 122° 50.749'W
Pt 1: 49° 13.384'N 122° 50.815'W
Pt 2: 49° 13.353'N 122° 50.662'W
Pt 3: 49° 13.317'N 122° 50.603'W
Pt 4: 49° 13.310'N 122° 50.863'W
2026-06-15 00:12 UTC To 2026-09-21 23:00 UTC Marine Works - Dredging Fraser River 3489(NAD83), 3490(WGS84)

Dredging operations will take place in Sapperton Channel at the Kiewit Marine Yard. 

Operations active 24 hours a day from 15 June to 21 September. 

The dredge anchors will be marked with lights at night.

Vessels on site will be anchored in the navigational channel and monitoring VHF channels 67 and 09.

 

NW-P-0788-26
Areas affected by the message
49° 10.952'N 122° 55.096'W
2026-06-10 17:24 UTC Aids to Navigation Fraser River 3489(NAD83), 3490(WGS84), 3491(WGS84)

Permanently discontinued.

Aids: Annieville Channel Pile Wall north light LL 366.3
Cancels NW-P-0675-26
NW-P-0786-26
Areas affected by the message
49° 28.772'N 124° 44.923'W
2026-06-09 16:13 UTC Aids to Navigation Strait of Georgia 3527(NAD83)

Nominal range has changed to 4nm with 37 cd

Aids: Repulse Point light buoy P42 LL 498
NW-P-0781-26
Areas affected by the message
53° 03.702'N 129° 13.838'W
2026-06-08 21:05 UTC Aids to Navigation North Coast 3982(WGS84)

Light Unreliable

Aids: Ashdown Island light LL 632
NW-P-0768-26
Areas affected by the message
49° 17.567'N 122° 52.050'W
2026-06-04 20:25 UTC Aids to Navigation Vancouver Harbour 3495(WGS84)

 The private steel pile mounted navigation aid in the vicinity of 49 17.567N 122 52.050W reported unlit

NW-P-0760-26
Areas affected by the message
48° 40.432'N 123° 24.760'W
2026-06-02 18:41 UTC Aids to Navigation Haro Strait 3479(NAD83)

Beacon Damaged

Aids: Tsehum Harbour entrance port bifurcation daybeacon
NW-P-0757-26
Areas affected by the message
49° 05.300'N 123° 07.786'W
2026-06-02 16:31 UTC Aids to Navigation Fraser River 3490(WGS84), 3492(NAD83)

Beacon is now submerged and considered a hazard to navigation. 

Aids: Sea Reach port daybeacon #5
NW-P-0750-26
Areas affected by the message
52° 30.793'N 121° 14.745'W
2026-06-01 15:07 UTC Aids to Navigation Pacific Coast

A new buoy has been deployed on Quesnel Lake at 52 30.793N 121 14.745W. LL 5583 Wildoat rock buoy.

NW-P-0746-26
Areas affected by the message
48° 22.643'N 124° 11.482'W
Pt 1: 48° 19.031'N 123° 52.360'W
Pt 2: 48° 16.593'N 123° 52.319'W
Pt 3: 48° 17.017'N 123° 56.445'W
Pt 4: 48° 26.761'N 124° 31.494'W
Pt 5: 48° 29.330'N 124° 31.569'W
2026-05-31 16:12 UTC To 2026-10-31 07:00 UTC Juan de Fuca Voluntary Lateral Displacement Juan de Fuca Strait 3606(NAD83)

Effective June 1 to October 31, 2026, the ECHO Program voluntary route alteration is active for all tugs transiting the Canadian inshore area of the Strait of Juan de Fuca to reduce underwater noise for at-risk whales.  

If it is safe and operationally feasible to do so, tugs are requested to navigate either through the outbound shipping lane or the inshore route alteration zone, while maintaining a buffer distance of 1,000 meters from the traffic separation scheme (TSS). The inshore route alteration zone is 1,500 meters wide and occurs between 123-52-21.192 W, 48-18-37.332 N and 124-31-33.378 W, 48-28-53.316 N, covering approximately 28 NM.  

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0745-26
Areas affected by the message
48° 27.186'N 125° 04.618'W
Pt 1: 48° 35.000'N 125° 09.000'W
Pt 2: 48° 35.000'N 125° 17.000'W
Pt 3: 48° 19.000'N 125° 17.000'W
Pt 4: 48° 19.000'N 124° 59.150'W
Pt 5: 48° 20.600'N 124° 58.167'W
Pt 6: 48° 22.550'N 125° 02.807'W
Pt 7: 48° 26.642'N 125° 00.808'W
Pt 8: 48° 28.132'N 124° 57.900'W
Pt 9: 48° 28.137'N 124° 44.075'W
Pt 10: 48° 26.867'N 124° 40.000'W
Pt 11: 48° 30.180'N 124° 40.000'W
Pt 12: 48° 32.100'N 124° 46.893'W
Pt 13: 48° 32.100'N 125° 08.980'W
2026-05-31 16:09 UTC To 2026-10-31 07:00 UTC Swiftsure Bank Voluntary Slowdown Juan de Fuca Strait, Pacific South Coast, West Coast Vancouver Island South 3606(NAD83)

Effective June 1 to October 31, 2026, the ECHO Program voluntary ship slowdown in the vicinity of Swiftsure Bank is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales.  If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

The voluntary ship slowdown takes place at Swiftsure Bank between 125° 17' W or 48° 19' N on the western or southern sides, and 124° 40’ W on the eastern side. All vessels transiting inbound or outbound are asked to slowdown when it is safe and operationally feasible to do so. Speed transition zones are in place about 2 nautical miles prior to entering the slowdown area. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0743-26
Areas affected by the message
48° 46.809'N 123° 03.620'W (Saturna Island, Vessel Restricted Zone)
Pt 1: 48° 47.367'N 123° 02.915'W
Pt 2: 48° 47.617'N 123° 02.483'W
Pt 3: 48° 47.473'N 123° 01.975'W
Pt 4: 48° 46.558'N 123° 03.147'W
Pt 5: 48° 46.333'N 123° 03.805'W
Pt 6: 48° 46.350'N 123° 05.150'W
Pt 7: 48° 46.683'N 123° 05.150'W
Pt 8: 48° 47.150'N 123° 02.733'W
48° 45.066'N 123° 16.818'W (Pender Island, Vessel Restricted Zone)
Pt 1: 48° 45.817'N 123° 19.300'W
Pt 2: 48° 46.217'N 123° 18.867'W
Pt 3: 48° 44.167'N 123° 13.917'W
Pt 4: 48° 44.153'N 123° 15.517'W
48° 33.318'N 124° 52.045'W (Swiftsure Bank, Speed Restriction Zone)
Pt 1: 48° 34.000'N 125° 06.000'W (northwest boundary)
Pt 2: 48° 32.100'N 125° 01.760'W (southwest boundary)
Pt 3: 48° 32.100'N 124° 49.545'W (southern boundary (traffic separation scheme lane)
Pt 4: 48° 32.017'N 124° 46.593'W (southern boundary (traffic separation scheme lane)
Pt 5: 48° 31.150'N 124° 43.483'W (southeast boundary)
Pt 6: 48° 35.717'N 124° 43.067'W (northeast boundary)
Pt 7: 48° 34.000'N 124° 54.190'W (northern boundary)
48° 38.846'N 124° 54.337'W (Mouth of the Nitinat River, Speed Restriction Zone)
Pt 1: 48° 42.377'N 125° 00.000'W
Pt 2: 48° 36.683'N 125° 00.000'W
Pt 3: 48° 36.683'N 124° 45.083'W
Pt 4: 48° 39.702'N 124° 48.943'W
Pt 5: 48° 39.653'N 124° 49.837'W
Pt 6: 48° 40.522'N 124° 52.344'W
Pt 7: 48° 40.871'N 124° 54.251'W
Pt 8: 48° 42.063'N 124° 56.863'W
2026-05-31 15:01 UTC To 2027-05-31 00:05 UTC Waterway information Strait of Georgia, West Coast Vancouver Island South 3441(NAD83), 3477(NAD27), CA471219(NAD83)

Effective 0700 UTC JUN 1 2026, to comply with the Interim Order for the Protection of Southern Resident Killer Whales (Orcinus orca) in the Waters of Southern British Columbia, 2026, vessels must not approach within a distance of 1000m of a Southern Resident Killer Whale in the Southern Resident Killer Whale critical habitat and British Columbia coastal waters east of Vancouver Island and south of Campbell River (Cape Mudge) and Ucluelet, including Barkley Sound (up to Port Alberni) and Howe Sound, with coordinates listed in Schedule 1 of the Interim Order.

These prohibitions are in effect until May 31st, 2027. Details of vessel exceptions from the approach distance are described in Sections 2(1), 2(2), 3(2), and 4(2) of the Interim Order. Note that vessels in transit are excepted from the approach distance measure.

Vessels must not operate or navigate within the two Vessel Restricted Zones, specifically those waters off the eastern coast of Saturna Island and southern coast of North Pender Island, with the coordinates listed in Schedule 2 of the Interim Order.

The Vessel Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Vessel Restricted Zone prohibitions are described in Sections 2(1), 2(2), 5(2) and 6(2) of the Interim Order.

In addition, vessels must adhere to the requirements of two Speed Restricted Zones near Swiftsure Bank, in which all vessels are restricted to a maximum speed of 10 knots over ground, with the coordinates listed in Schedule 3 of the Interim Order.

The Speed Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Speed Restricted Zones are described in Sections 2(1), 2(2), 7(2) and 8(2) of the Interim Order.

Failure to comply with the Interim Order for the Protection of the Southern Resident Killer Whales in the Waters of Southern British Columbia, 2026 could lead to enforcement action, including fines.

Further details are available at Transport Canada’s website (Interim Order for the Protection of the Southern Resident Killer Whale (Orcinus orca) in the Waters of Southern British Columbia, 2026 (canada.ca), or upon request from a Marine Communications and Traffic Services Centre.

NW-P-0735-26
Areas affected by the message
49° 12.500'N 122° 53.533'W
2026-05-29 01:55 UTC To 2026-09-01 07:00 UTC Waterway information - Bridge Construction Fraser River 3489(NAD83), 3490(WGS84)

Bridge construction is ongoing on the Patullo Bridge at 49 12.500N 122 53.533W.

Hours of operation from 1300 to 1000 UTC daily.

Mariners are asked to avoid areas marked with flashing amber lights and to contact work vessels on channel 74 

sixty minutes prior to transiting for restrictions and current channel closures.

Vessels on site monitoring VHF channels 16, 64A, 69, 71 and 74.

Minimum wake.

Cancels NW-P-0473-26
NW-P-0713-26
Areas affected by the message
49° 01.212'N 123° 11.688'W
2026-05-22 20:27 UTC Scientific instrument Strait of Georgia 3492(NAD83)

A bottom mounted data retrieving instrument has been established in the Strait of Georgia at 49 01.212N 123 11.688W.

The top of the instrument will be 1.0 meters above the seabed and a 60 meter groundline with a weighted line will extend along the seabed. 

will be in place for approximately 1 year. 

Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.
Table
Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.
ID Date Title Areas Charts Description
NW-P-0821-26 2026-06-17 16:45 UTC To 2026-07-11 01:00 UTC Marine Works Fraser River 3489(NAD83), 3490(WGS84), 3491(WGS84)

Dredging operations at the Fraser Surrey docks upper and lower approaches.

Hours of operations daily from 1300-0100 UTC Jun18th to Jul 11th.

Vessels on site monitoring VHF CH. 74

Mariners requested to call 30 mins on approach, floating pipe will be equipped with marker lights during hours of darkness. 

NW-P-0820-26 2026-06-17 10:29 UTC To 2026-09-18 02:00 UTC Marine Works Esquimalt Harbour 3419(WGS84)

Environmental fills undewater in Esquimalt Harbour at 48 26.783N 123 26.491W.

Hours of operation Monday to Friday from 1400UTC to 0200UTC 17 Jun to 17 Sep 2026. 

Vessels on site monitoring VHF CH. 10.

 

NW-P-0812-26 2026-06-15 22:03 UTC Aids to Navigation Strait of Georgia 3540(WGS84)

Light changed to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.4 Campbell River Ferry Terminal Dolphin No.3

Aids: Campbell River ferry terminal light #2 LL 512.3
Cancels NW-P-1784-25
NW-P-0811-26 2026-06-15 22:01 UTC Aids to Navigation Strait of Georgia 3540(WGS84)

Light changed from to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.3 Campbell River Ferry Terminal Dolphin No. 2.

Aids: Campbell River ferry terminal dolphin light #3 LL 512.4
NW-P-0809-26 2026-06-15 16:02 UTC To 2026-12-01 07:59 UTC Waterway information - ECHO Program Haro Strait, Strait of Georgia, Washington State - San Juan Islands 3424(NAD83)

HARO STRAIT AND BOUNDARY PASS – ECHO Program 2025 Voluntary Ship Slowdown 

Effective June 15 to November 30, 2026 the ECHO Program voluntary ship slowdown through Haro Strait and Boundary Pass is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales. This initiative will remain in effect 24 hours per day until 2359 PDT on November 30, 2026, depending on southern resident killer whale presence in the fall. If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

This voluntary slowdown takes place between the vessel traffic separation scheme at the south end of Haro Strait at 48-24-22.78 N ,123-12-15.26 W, and the vessel traffic separation scheme at the north end of Boundary Pass at 48-46-39.28 N, 123-1-36.84 W. There are also two optional slow down areas, one rounding Turn Point and the other between Saturna Island and Alden Point, Patos Island. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups.  

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0807-26 2026-06-15 15:43 UTC To 2026-08-30 07:00 UTC Scientific Survey - Wave Glider Explorer, West Coast Vancouver Island South 3653(EPSG:4326)

An autonomous Wave Glider will be conducting surveys off the southern half of the west coast of Vancouver Island.

Surveys will run 24 hours a day from 16 June to 29 August. 

The Wave Glider is an autonomous surface vessel, 3m in length and with instruments extending 1m above the waterline. 

The Wave Glider will transit at slow speeds and may change heading frequently. 

NW-P-0806-26 2026-06-15 06:18 UTC To 2027-03-01 07:00 UTC Marine Works - Dredging Fraser River, Strait of Georgia 3489(NAD83), 3490(WGS84), 3490(WGS84), 3491(WGS84)

The RIVERFLOW SPIRIT will be conducting maintenance dredging within the main channel of the Fraser River from KM-2 to KM-35.  Disposal activities will be undertaken within the In-River Disposal Site (49 11.753N 122 55.043W), and at the Sand Heads Spoil Site (49 06.727N 123 11.906W).

Hours of Operation:  24 hours.

Monitoring VHF Channel 74.

All vessels are requested to make contact upon approach.

 

NW-P-0805-26 2026-06-15 00:12 UTC To 2026-09-21 23:00 UTC Marine Works - Dredging Fraser River 3489(NAD83), 3490(WGS84)

Dredging operations will take place in Sapperton Channel at the Kiewit Marine Yard. 

Operations active 24 hours a day from 15 June to 21 September. 

The dredge anchors will be marked with lights at night.

Vessels on site will be anchored in the navigational channel and monitoring VHF channels 67 and 09.

 

NW-P-0788-26 2026-06-10 17:24 UTC Aids to Navigation Fraser River 3489(NAD83), 3490(WGS84), 3491(WGS84)

Permanently discontinued.

Aids: Annieville Channel Pile Wall north light LL 366.3
Cancels NW-P-0675-26
NW-P-0786-26 2026-06-09 16:13 UTC Aids to Navigation Strait of Georgia 3527(NAD83)

Nominal range has changed to 4nm with 37 cd

Aids: Repulse Point light buoy P42 LL 498
NW-P-0781-26 2026-06-08 21:05 UTC Aids to Navigation North Coast 3982(WGS84)

Light Unreliable

Aids: Ashdown Island light LL 632
NW-P-0768-26 2026-06-04 20:25 UTC Aids to Navigation Vancouver Harbour 3495(WGS84)

 The private steel pile mounted navigation aid in the vicinity of 49 17.567N 122 52.050W reported unlit

NW-P-0760-26 2026-06-02 18:41 UTC Aids to Navigation Haro Strait 3479(NAD83)

Beacon Damaged

Aids: Tsehum Harbour entrance port bifurcation daybeacon
NW-P-0757-26 2026-06-02 16:31 UTC Aids to Navigation Fraser River 3490(WGS84), 3492(NAD83)

Beacon is now submerged and considered a hazard to navigation. 

Aids: Sea Reach port daybeacon #5
NW-P-0750-26 2026-06-01 15:07 UTC Aids to Navigation Pacific Coast

A new buoy has been deployed on Quesnel Lake at 52 30.793N 121 14.745W. LL 5583 Wildoat rock buoy.

NW-P-0746-26 2026-05-31 16:12 UTC To 2026-10-31 07:00 UTC Juan de Fuca Voluntary Lateral Displacement Juan de Fuca Strait 3606(NAD83)

Effective June 1 to October 31, 2026, the ECHO Program voluntary route alteration is active for all tugs transiting the Canadian inshore area of the Strait of Juan de Fuca to reduce underwater noise for at-risk whales.  

If it is safe and operationally feasible to do so, tugs are requested to navigate either through the outbound shipping lane or the inshore route alteration zone, while maintaining a buffer distance of 1,000 meters from the traffic separation scheme (TSS). The inshore route alteration zone is 1,500 meters wide and occurs between 123-52-21.192 W, 48-18-37.332 N and 124-31-33.378 W, 48-28-53.316 N, covering approximately 28 NM.  

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0745-26 2026-05-31 16:09 UTC To 2026-10-31 07:00 UTC Swiftsure Bank Voluntary Slowdown Juan de Fuca Strait, Pacific South Coast, West Coast Vancouver Island South 3606(NAD83)

Effective June 1 to October 31, 2026, the ECHO Program voluntary ship slowdown in the vicinity of Swiftsure Bank is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales.  If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

The voluntary ship slowdown takes place at Swiftsure Bank between 125° 17' W or 48° 19' N on the western or southern sides, and 124° 40’ W on the eastern side. All vessels transiting inbound or outbound are asked to slowdown when it is safe and operationally feasible to do so. Speed transition zones are in place about 2 nautical miles prior to entering the slowdown area. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0743-26 2026-05-31 15:01 UTC To 2027-05-31 00:05 UTC Waterway information Strait of Georgia, West Coast Vancouver Island South 3441(NAD83), 3477(NAD27), CA471219(NAD83)

Effective 0700 UTC JUN 1 2026, to comply with the Interim Order for the Protection of Southern Resident Killer Whales (Orcinus orca) in the Waters of Southern British Columbia, 2026, vessels must not approach within a distance of 1000m of a Southern Resident Killer Whale in the Southern Resident Killer Whale critical habitat and British Columbia coastal waters east of Vancouver Island and south of Campbell River (Cape Mudge) and Ucluelet, including Barkley Sound (up to Port Alberni) and Howe Sound, with coordinates listed in Schedule 1 of the Interim Order.

These prohibitions are in effect until May 31st, 2027. Details of vessel exceptions from the approach distance are described in Sections 2(1), 2(2), 3(2), and 4(2) of the Interim Order. Note that vessels in transit are excepted from the approach distance measure.

Vessels must not operate or navigate within the two Vessel Restricted Zones, specifically those waters off the eastern coast of Saturna Island and southern coast of North Pender Island, with the coordinates listed in Schedule 2 of the Interim Order.

The Vessel Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Vessel Restricted Zone prohibitions are described in Sections 2(1), 2(2), 5(2) and 6(2) of the Interim Order.

In addition, vessels must adhere to the requirements of two Speed Restricted Zones near Swiftsure Bank, in which all vessels are restricted to a maximum speed of 10 knots over ground, with the coordinates listed in Schedule 3 of the Interim Order.

The Speed Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Speed Restricted Zones are described in Sections 2(1), 2(2), 7(2) and 8(2) of the Interim Order.

Failure to comply with the Interim Order for the Protection of the Southern Resident Killer Whales in the Waters of Southern British Columbia, 2026 could lead to enforcement action, including fines.

Further details are available at Transport Canada’s website (Interim Order for the Protection of the Southern Resident Killer Whale (Orcinus orca) in the Waters of Southern British Columbia, 2026 (canada.ca), or upon request from a Marine Communications and Traffic Services Centre.

NW-P-0735-26 2026-05-29 01:55 UTC To 2026-09-01 07:00 UTC Waterway information - Bridge Construction Fraser River 3489(NAD83), 3490(WGS84)

Bridge construction is ongoing on the Patullo Bridge at 49 12.500N 122 53.533W.

Hours of operation from 1300 to 1000 UTC daily.

Mariners are asked to avoid areas marked with flashing amber lights and to contact work vessels on channel 74 

sixty minutes prior to transiting for restrictions and current channel closures.

Vessels on site monitoring VHF channels 16, 64A, 69, 71 and 74.

Minimum wake.

Cancels NW-P-0473-26
NW-P-0713-26 2026-05-22 20:27 UTC Scientific instrument Strait of Georgia 3492(NAD83)

A bottom mounted data retrieving instrument has been established in the Strait of Georgia at 49 01.212N 123 11.688W.

The top of the instrument will be 1.0 meters above the seabed and a 60 meter groundline with a weighted line will extend along the seabed. 

will be in place for approximately 1 year. 

Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.
Compact
Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.
ID Date Charts Title
NW-P-0821-26 2026-06-17 16:45 UTC To 2026-07-11 01:00 UTC 3489(NAD83), 3490(WGS84), 3491(WGS84) Marine Works

Dredging operations at the Fraser Surrey docks upper and lower approaches.

Hours of operations daily from 1300-0100 UTC Jun18th to Jul 11th.

Vessels on site monitoring VHF CH. 74

Mariners requested to call 30 mins on approach, floating pipe will be equipped with marker lights during hours of darkness. 

NW-P-0820-26 2026-06-17 10:29 UTC To 2026-09-18 02:00 UTC 3419(WGS84) Marine Works

Environmental fills undewater in Esquimalt Harbour at 48 26.783N 123 26.491W.

Hours of operation Monday to Friday from 1400UTC to 0200UTC 17 Jun to 17 Sep 2026. 

Vessels on site monitoring VHF CH. 10.

 

NW-P-0812-26 2026-06-15 22:03 UTC 3540(WGS84) Aids to Navigation

Light changed to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.4 Campbell River Ferry Terminal Dolphin No.3

Aids: Campbell River ferry terminal light #2 LL 512.3
Cancels NW-P-1784-25
NW-P-0811-26 2026-06-15 22:01 UTC 3540(WGS84) Aids to Navigation

Light changed from to nominal range 8NM at night, light 24 hrs. Flash synchronized with 512.3 Campbell River Ferry Terminal Dolphin No. 2.

Aids: Campbell River ferry terminal dolphin light #3 LL 512.4
NW-P-0809-26 2026-06-15 16:02 UTC To 2026-12-01 07:59 UTC 3424(NAD83) Waterway information - ECHO Program

HARO STRAIT AND BOUNDARY PASS – ECHO Program 2025 Voluntary Ship Slowdown 

Effective June 15 to November 30, 2026 the ECHO Program voluntary ship slowdown through Haro Strait and Boundary Pass is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales. This initiative will remain in effect 24 hours per day until 2359 PDT on November 30, 2026, depending on southern resident killer whale presence in the fall. If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

This voluntary slowdown takes place between the vessel traffic separation scheme at the south end of Haro Strait at 48-24-22.78 N ,123-12-15.26 W, and the vessel traffic separation scheme at the north end of Boundary Pass at 48-46-39.28 N, 123-1-36.84 W. There are also two optional slow down areas, one rounding Turn Point and the other between Saturna Island and Alden Point, Patos Island. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups.  

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0807-26 2026-06-15 15:43 UTC To 2026-08-30 07:00 UTC 3653(EPSG:4326) Scientific Survey - Wave Glider

An autonomous Wave Glider will be conducting surveys off the southern half of the west coast of Vancouver Island.

Surveys will run 24 hours a day from 16 June to 29 August. 

The Wave Glider is an autonomous surface vessel, 3m in length and with instruments extending 1m above the waterline. 

The Wave Glider will transit at slow speeds and may change heading frequently. 

NW-P-0806-26 2026-06-15 06:18 UTC To 2027-03-01 07:00 UTC 3489(NAD83), 3490(WGS84), 3490(WGS84), 3491(WGS84) Marine Works - Dredging

The RIVERFLOW SPIRIT will be conducting maintenance dredging within the main channel of the Fraser River from KM-2 to KM-35.  Disposal activities will be undertaken within the In-River Disposal Site (49 11.753N 122 55.043W), and at the Sand Heads Spoil Site (49 06.727N 123 11.906W).

Hours of Operation:  24 hours.

Monitoring VHF Channel 74.

All vessels are requested to make contact upon approach.

 

NW-P-0805-26 2026-06-15 00:12 UTC To 2026-09-21 23:00 UTC 3489(NAD83), 3490(WGS84) Marine Works - Dredging

Dredging operations will take place in Sapperton Channel at the Kiewit Marine Yard. 

Operations active 24 hours a day from 15 June to 21 September. 

The dredge anchors will be marked with lights at night.

Vessels on site will be anchored in the navigational channel and monitoring VHF channels 67 and 09.

 

NW-P-0788-26 2026-06-10 17:24 UTC 3489(NAD83), 3490(WGS84), 3491(WGS84) Aids to Navigation

Permanently discontinued.

Aids: Annieville Channel Pile Wall north light LL 366.3
Cancels NW-P-0675-26
NW-P-0786-26 2026-06-09 16:13 UTC 3527(NAD83) Aids to Navigation

Nominal range has changed to 4nm with 37 cd

Aids: Repulse Point light buoy P42 LL 498
NW-P-0781-26 2026-06-08 21:05 UTC 3982(WGS84) Aids to Navigation

Light Unreliable

Aids: Ashdown Island light LL 632
NW-P-0768-26 2026-06-04 20:25 UTC 3495(WGS84) Aids to Navigation

 The private steel pile mounted navigation aid in the vicinity of 49 17.567N 122 52.050W reported unlit

NW-P-0760-26 2026-06-02 18:41 UTC 3479(NAD83) Aids to Navigation

Beacon Damaged

Aids: Tsehum Harbour entrance port bifurcation daybeacon
NW-P-0757-26 2026-06-02 16:31 UTC 3490(WGS84), 3492(NAD83) Aids to Navigation

Beacon is now submerged and considered a hazard to navigation. 

Aids: Sea Reach port daybeacon #5
NW-P-0750-26 2026-06-01 15:07 UTC Aids to Navigation

A new buoy has been deployed on Quesnel Lake at 52 30.793N 121 14.745W. LL 5583 Wildoat rock buoy.

NW-P-0746-26 2026-05-31 16:12 UTC To 2026-10-31 07:00 UTC 3606(NAD83) Juan de Fuca Voluntary Lateral Displacement

Effective June 1 to October 31, 2026, the ECHO Program voluntary route alteration is active for all tugs transiting the Canadian inshore area of the Strait of Juan de Fuca to reduce underwater noise for at-risk whales.  

If it is safe and operationally feasible to do so, tugs are requested to navigate either through the outbound shipping lane or the inshore route alteration zone, while maintaining a buffer distance of 1,000 meters from the traffic separation scheme (TSS). The inshore route alteration zone is 1,500 meters wide and occurs between 123-52-21.192 W, 48-18-37.332 N and 124-31-33.378 W, 48-28-53.316 N, covering approximately 28 NM.  

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0745-26 2026-05-31 16:09 UTC To 2026-10-31 07:00 UTC 3606(NAD83) Swiftsure Bank Voluntary Slowdown

Effective June 1 to October 31, 2026, the ECHO Program voluntary ship slowdown in the vicinity of Swiftsure Bank is active for all inbound and outbound commercial and government vessels to reduce underwater noise for at-risk whales.  If it is safe and operationally feasible to do so, commercial and government vessels are requested to not exceed the following speeds through the water: 

11 knots – Bulkers, tankers, general cargo vessels, and government vessels; and, 

14.5 knots – Vehicle carriers, cruise ships, and container vessels. 

The voluntary ship slowdown takes place at Swiftsure Bank between 125° 17' W or 48° 19' N on the western or southern sides, and 124° 40’ W on the eastern side. All vessels transiting inbound or outbound are asked to slowdown when it is safe and operationally feasible to do so. Speed transition zones are in place about 2 nautical miles prior to entering the slowdown area. 

The ECHO Program is led by the Vancouver Fraser Port Authority in collaboration with government agencies, Indigenous communities, industry partners and environmental groups. 

For more detailed information, refer to the following internet web address: 

https://www.portvancouver.com/echo/ 

NW-P-0743-26 2026-05-31 15:01 UTC To 2027-05-31 00:05 UTC 3441(NAD83), 3477(NAD27), CA471219(NAD83) Waterway information

Effective 0700 UTC JUN 1 2026, to comply with the Interim Order for the Protection of Southern Resident Killer Whales (Orcinus orca) in the Waters of Southern British Columbia, 2026, vessels must not approach within a distance of 1000m of a Southern Resident Killer Whale in the Southern Resident Killer Whale critical habitat and British Columbia coastal waters east of Vancouver Island and south of Campbell River (Cape Mudge) and Ucluelet, including Barkley Sound (up to Port Alberni) and Howe Sound, with coordinates listed in Schedule 1 of the Interim Order.

These prohibitions are in effect until May 31st, 2027. Details of vessel exceptions from the approach distance are described in Sections 2(1), 2(2), 3(2), and 4(2) of the Interim Order. Note that vessels in transit are excepted from the approach distance measure.

Vessels must not operate or navigate within the two Vessel Restricted Zones, specifically those waters off the eastern coast of Saturna Island and southern coast of North Pender Island, with the coordinates listed in Schedule 2 of the Interim Order.

The Vessel Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Vessel Restricted Zone prohibitions are described in Sections 2(1), 2(2), 5(2) and 6(2) of the Interim Order.

In addition, vessels must adhere to the requirements of two Speed Restricted Zones near Swiftsure Bank, in which all vessels are restricted to a maximum speed of 10 knots over ground, with the coordinates listed in Schedule 3 of the Interim Order.

The Speed Restricted Zones are in effect until November 30th, 2026. Details of vessel exceptions from the Speed Restricted Zones are described in Sections 2(1), 2(2), 7(2) and 8(2) of the Interim Order.

Failure to comply with the Interim Order for the Protection of the Southern Resident Killer Whales in the Waters of Southern British Columbia, 2026 could lead to enforcement action, including fines.

Further details are available at Transport Canada’s website (Interim Order for the Protection of the Southern Resident Killer Whale (Orcinus orca) in the Waters of Southern British Columbia, 2026 (canada.ca), or upon request from a Marine Communications and Traffic Services Centre.

NW-P-0735-26 2026-05-29 01:55 UTC To 2026-09-01 07:00 UTC 3489(NAD83), 3490(WGS84) Waterway information - Bridge Construction

Bridge construction is ongoing on the Patullo Bridge at 49 12.500N 122 53.533W.

Hours of operation from 1300 to 1000 UTC daily.

Mariners are asked to avoid areas marked with flashing amber lights and to contact work vessels on channel 74 

sixty minutes prior to transiting for restrictions and current channel closures.

Vessels on site monitoring VHF channels 16, 64A, 69, 71 and 74.

Minimum wake.

Cancels NW-P-0473-26
NW-P-0713-26 2026-05-22 20:27 UTC 3492(NAD83) Scientific instrument

A bottom mounted data retrieving instrument has been established in the Strait of Georgia at 49 01.212N 123 11.688W.

The top of the instrument will be 1.0 meters above the seabed and a 60 meter groundline with a weighted line will extend along the seabed. 

will be in place for approximately 1 year. 

Showing results 21 to 40, from 259 total results.
Showing results 21 to 40, from 259 total results.

Related links

Report a problem on this page
Please select all that apply:

Privacy statement

Thank you for your help!

You will not receive a reply. For enquiries, please contact us.

Date Modified: