Buoy 1 metre in diameter and 3 metres tall showing yellow flashing ODAS sequence deployed at 48 53.301N 125 38.310W.
Bridge construction is taking place in Squamish Harbour at 49 41.860N 123 09.096W.
The six new piers and equipment on site are marked with reflectors and yellow flashing lights that display a flash
characteristic of (FI) 4s, and have a minimum nautical range of 0.5 nautical mile.
Mariners are asked to transit between the third and fourth pier.
Hours of operation are 1400 to 0000 UTC daily, Monday to Saturday.
Work vessels Gibson and Nil I on site monitoring VHF channel 6, 16 and 72.
Caution.
A subsurface scientific platform was deployed on the seafloor in the vicinity of Hartley bay, 53 25.348N 129 14.851W, at a depth of 65m. The platform is connected by cable to a shore station located at 53 25.523N 129 14.895W.
An uncharted underwater cable has been installed between Zeballos and Esperanza.
An uncharted underwater cable has been installed between Quatsino and Port Alice.
Temporarily changed from Red 144° to 149°, White 149° to 152°, Green 152° to 154° to Red 144° 30’ to 149°, White 149° to 152°30’, Green 152°30’ to 155° 30’.
An uncharted cable has been placed between Quatsino 50 32.217N 127 37.450W and Winter Harbour 50 31.633N 128 01.017W.
Prince Rupert MCTS. Transmit and receive services on VHF RT CH83A located at Klemtu intermittent 111814 UTC Sep 2024.
An ODAS buoy has been deployed in Patricia Bay at 48 38.996N 123 27.929W.
Fl (5) Y 20s.
Unreliable
An uncharted cable has been placed between Coal Harbour 50 36.040N 127 34.320W and Quatsino 50 32.130N 127 37.270W.
Sub surface mooring has been deployed at 48 23.041N 125 48.242W at a depth of 151 metres
An ODAS buoy has been deployed in the Strait of Georgia at 49 43.911N 124 46.511W.
A sunken barge with machinery equipment onboard has been reported in Pitt River, under the Lougheed Highway Bridge at 49 14.945N 122 43.563W.
Pipeline jetty construction at Ridley Island at 54 12.380N 130 20.060W
Hours of operation 1400 UTC until 0400 UTC daily September 3 2024 until January 31 2026
Caution
Minimum Wake
Marine works and construction of new BC Ferries berth will take place in Shearwater, in the vicitiny of 52 08.733N 128 05.133W.
Hours of operation daily from 1400UTC to 0200UTC, Sept 03 to Oct 13.
Vessels on site monitoring VHF Channel 69.
Minimum wake.
Port MacNeill municipal dock, berth L at 50 35.518N 127 05.329W is damaged and unusable
Prince Rupert MCTS. All CMB, VHF DF, VHF DSC, VHF RT and VTS services located at Calvert Island operating intermittently 301515 UTC Aug 2024.
A series of five subsurface scientific instruments have been deployed on the seafloor off the west coast of Vancouver Island, near the Endeavour hydrothermal vent.
Underwater Cable installed between Queens Cove (49 52.383N 126 58.750W) and Nuchatlaht (49 59.150N 126 56.233W).
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.