NAVWARN details

ID NW-P-0334-21
Date 2021-03-02 19:11 UTC To 2021-03-23 02:00 UTC
Status Cancelled
Title Marine works
Cancels NW-P-0333-21
Areas Douglas Channel & Gardner Canal
Categories Wharf Construction
Description

Wharf construction at

53 59.533N 128 41.517W
53 59.783N 128 41.567W
53 59.783N 128 41.650W
53 59.533N 128 41.617W

from 1400 UTC 3 Mar until 0200 UTC 23 Mar 21.

Hours of operation 1400 UTC until 0200 UTC.

Work vessels monitor VHF Ch 06. Minimum wake.

Position
Centroid : 53° 59.654'N 128° 41.587'W
    Pt 1: 53° 59.533'N 128° 41.517'W
    Pt 2: 53° 59.783'N 128° 41.567'W
    Pt 3: 53° 59.783'N 128° 41.650'W
    Pt 4: 53° 59.533'N 128° 41.617'W
Charts 3908(NAD83)

Related links

Date Modified: