NAVWARN details

ID NW-P-0329-21
Date 2021-03-02 10:52 UTC To 2021-03-31 23:59 UTC
Status Cancelled
Title Marine works - wharf construction/pile driving
Areas Fraser River
Categories Wharf Construction
Description

Marine works in the vicinity of the New pattullo Bridge Pier S1 located at 49 12.500N 122 53.533W. 

Operations active 24 hours a day from 1 Mar to 31 Mar 2021. 

Operations include wharf construction and pile driving. 

Periodic restriction of the main navigational channel south passage. 

On site vessels monitoring VHF Channels 06, 16, 69 and 74.

Position 49° 12.500'N 122° 53.533'W
Charts 3489(NAD83), 3490(WGS84)

Related links

Date Modified: