NAVWARN details
Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
ID | NW-P-0329-21 |
Date | 2021-03-02 10:52 UTC To 2021-03-31 23:59 UTC |
Status | Cancelled |
Title | Marine works - wharf construction/pile driving |
Areas |
Fraser River |
Categories |
Wharf Construction |
Description | Marine works in the vicinity of the New pattullo Bridge Pier S1 located at 49 12.500N 122 53.533W. Operations active 24 hours a day from 1 Mar to 31 Mar 2021. Operations include wharf construction and pile driving. Periodic restriction of the main navigational channel south passage. On site vessels monitoring VHF Channels 06, 16, 69 and 74. |
Position | 49° 12.500'N 122° 53.533'W |
Charts | 3489(NAD83), 3490(WGS84) |
Related links
- Date Modified: