NAVWARN details
Navigational Warnings (NAVWARNs) replace Notices to Shipping (NOTSHIPs) and shall be construed as Notices to Shipping
ID | NW-C-2541-24 |
Date | 2024-09-12 13:46 UTC To 2024-10-01 14:50 UTC |
Status | Cancelled |
Title | Marine works |
Cancels | NW-C-2536-24 |
Cancelled by | NW-C-2756-24 |
Areas |
Lake St. Clair |
Vicinity | Middle of lake |
Categories |
Dredging Operations |
Description | Dredging operations taking place 24 hours a day between the St. Clair Crib light and buoy 28. Tug Kristin Joelle, tug Kimberly Joy and barge OB185 on site, monitoring channels 12 and 18. Vessels are requested to reduce speed and not meet opposing traffic in this area. |
Position |
Centroid : 42° 28.726'N 082° 44.172'W
Pt 1: 42° 29.673'N 082° 42.917'W
Pt 2: 42° 29.583'N 082° 42.771'W Pt 3: 42° 27.744'N 082° 45.114'W Pt 4: 42° 27.837'N 082° 45.277'W Pt 5: 42° 27.955'N 082° 45.535'W Pt 6: 42° 29.749'N 082° 43.102'W |
Charts | 14853(NAD83) |
Related links
- Date Modified: