NAVWARN details

ID NW-P-0180-23
Date 2023-02-02 14:33 UTC To 2023-02-19 12:00 UTC
Status Cancelled
Title Marine works
Cancels NW-P-0179-23
Areas Fraser River - North Arm
Categories Marine Works (Other)
Description

Marine works for the installation of timber piles, timber planking and steel protection plates in the vicinity of the Oak St. Bridge located at 49 11.967N 123 07.567W.

Hours of operation daily from 14:00 to 0130 and 0200 to 1200 UTC from Feb 03 to Feb 19 2023.

Work Vessels monitoring VHF Ch 12.

Minimum Wake.

Position 49° 11.967'N 123° 07.567'W
Charts 3491(WGS84)

Related links

Date Modified: